Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Dec 15, 2017 17:59:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Dec 15, 2017 17:59:26 IST

Blog Entry# 2353566
Posted: Jul 15 2017 (17:20)

2 Responses
Last Response: Jul 31 2017 (02:09)
  
Rail News
0 Followers
2324 views
Commentary/Human InterestWR/Western  -  
Jul 15 2017 (09:43)   Railways to start prelim work on Ujjain-Fatehabad route

rdb*^   132895 news posts
Entry# 2353566   News Entry# 308505         Tags   Past Edits
INDORE: The Railways will begin earthwork for the Ujjain-Fatehabad gauge conversion project. Railways officials said that the earthwork is estimated to cost Rs 4 crore will take about 18 months to complete.
Officials said this 22km long section is part of a larger gauge conversion project of Indore-Fatehabad-Ujjain rail section, the estimated cost of which is Rs 120 crore. "Conversion of this whole section will reduce rail connectivity distance by around 400 km and this project is expected to be completed in 2018," said a spokesman with Ratlam division of the western railways.
The
...
more...
existing meter gauge rail lines on this 22 km section will be replaced with a broad gauge rail line. The earthwork will include soil exploration and a survey to determine soil types with a view to identify its suitability to design the foundation for the rail lines," said an official. He added that the earthwork will also help avoid troublesome spots, unstable hill sides and swampy and rock areas.
The Railways has already completed the Indore-Fatehabad section and work for the remaining 22km section between Ujjain and Fatehabad is now set to begin.
The Railways had closed this 134-year old meter gauge rail section between Fatehabad-Ujjain and Fatehabad-Indore in February, 2014.
The conversion of this rail section will reduce travel time by around half an hour. It will also reduce travel distance by around 20 km. It takes more than two hours for a train to travel from Indore to Ujjain. After the MG section is converted into BG, trains will take only one and a half hour to travel from Ujjain to Indore.

  
976 views
Jul 15 2017 (17:20)
srinivasvasanthi~   4177 blog posts   15 correct pred (54% accurate)
Re# 2353566-1            Tags   Past Edits
Conversion of this whole section will reduce rail connectivity distance by around 400 km and this project is expected to be completed in 2018," said a spokesman with Ratlam division of the western railways.
***by around 400 km is wrong ,by around 40 km is the right statement ,some typography error occurred ***

  
2206 views
Jul 31 2017 (02:09)
® राहुल जैन ☺ झाडू वाले™🚅🚃🚃🚃🚃🚃*^~   10384 blog posts   14940 correct pred (63% accurate)
Re# 2353566-2            Tags   Past Edits

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 25
Trains with ARP 15 Dep on: Sat Dec 30
Trains with ARP 30 Dep on: Sun Jan 14
Trains with ARP 120 Dep on: Sat Apr 14

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.