Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Oct 22, 2017 12:19:47 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Oct 22, 2017 12:19:47 IST

Blog Entry# 2353969
Posted: Jul 16 2017 (00:12)

8 Responses
Last Response: Jul 17 2017 (13:07)
  
Rail News
0 Followers
1416 views
Commentary/Human Interest
Jul 15 2017 (22:54)   Delhi to Varanasi in less than 3hrs?

rdb*^   132807 news posts
Entry# 2353969   News Entry# 308557         Tags   Past Edits
NEW DELHI: A bullet train in the future would cut down travel time between Delhi and Varanasi - a distance of 720 km - from the present 12 hours, to just 2 hours and 37 minutes. The project connecting the holy city - Lok Sabha constituency of Prime Minister Modi - with national capital is a priority for the ruling BJP dispensation. When operational, travel from Delhi to Lucknow (440 km) will take just one hour and 38 minutes. A Spanish firm M/s INECO-TYPSA-ICT which was doing feasibility study of the project, which is part of Delhi-Kolkata high-speed corridor (1474.5 km) has submitted the draft final report to high-speed rail corporation and railway board on Thursday. According to the report, the fare of Rs 4.5/km was considered as base fare which means travel between Delhi to Lucknow will cost at least Rs 1,980 and Delhi to Varanasi will cost around Rs...
more...
3,240. The project will be the third high-speed project at different stages of conception and execution. The construction on Mumbai-Ahmedabad corridor will start in September this year while the Mumbai-Nagpur stretch is on advance stage of getting approvals.As per the report, if the project starts in 2021, the Delhi-Lucknow stretch will be operational by 2029 while Delhi-Varanasi stretch will be functional by 2031. The Delhi-Varanasi stretch will pass through Greater Noida, Aligarh, Lucknow, Sultanpur and Jaunpur. The station at Jaunpur was not part of earlier plan, but was added after lobbying by the area MP Krishna Pratap Singh who argued that the stoppage will ensure development of the backward region of eastern UP. The report has proposed the main terminal in Delhi near Akshardham Temple. The preliminary cost, without rolling stock, being worked out is estimated to be about Rs 52,680 crore for the Delhi-Varanasi stretch of 720km and around Rs 1.21 lakh crore for the entire Delhi-Kolkata corridor of 1474.5km. A railway official said the report was discussed by the railway board on Thursday and changes which were suggested will be incorporated. He added that the alignment has been designed for maximum operational speed of 300 km/h, in order to meet a commercial speed of 250 km/h.

3 posts - Sun Jul 16, 2017

  
1016 views
Jul 16 2017 (13:38)
Shubham Yadav^~   1660 blog posts   5604 correct pred (77% accurate)
Re# 2353969-4            Tags   Past Edits
normal trains to ruk nhi rhi .... bullet ke khawab or dikha do

  
976 views
Jul 16 2017 (14:15)
Indian Railways the life line of our Nation~   18870 blog posts   137 correct pred (83% accurate)
Re# 2353969-5            Tags   Past Edits
Kam se kam ye news padh ke man to santushti to mili hogi😀😀😀

  
961 views
Jul 16 2017 (14:25)
Shubham Yadav^~   1660 blog posts   5604 correct pred (77% accurate)
Re# 2353969-6            Tags   Past Edits
man ko santusti mile na mile , but IRI ko 5-10 new blog dekhne ko mil jayenge
or ha , kuch GK bhi badh jayegi 😂😂😂

  
1043 views
Jul 16 2017 (17:55)
kaashi9451   20 blog posts
Re# 2353969-7            Tags   Past Edits
bro unko toh yeh news sunkar dast hone laga

  
1062 views
Jul 17 2017 (13:07)
The Legendary Godan Express~   613 blog posts   40 correct pred (49% accurate)
Re# 2353969-8            Tags   Past Edits
The station at Jaunpur was not part of earlier plan, but was added after lobbying by the area MP Krishna Pratap Singh who argued that the stoppage will ensure development of the backward region of eastern UP
Inlog ka Jaunpur se koi lena dena hi nahi tha lekin pahli baar MP ne apne haath khade kiye kuch toh akkal aayi

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Nov 1
Trains with ARP 15 Dep on: Mon Nov 6
Trains with ARP 30 Dep on: Tue Nov 21
Trains with ARP 120 Dep on: Mon Feb 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.