Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Thu Oct 19, 2017 07:27:41 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Thu Oct 19, 2017 07:27:41 IST

Blog Entry# 2356925
Posted: Jul 19 2017 (14:10)

1 Responses
Last Response: Jul 19 2017 (20:43)
  
General Travel
0 Followers
1663 views
Jul 19 2017 (14:10)   UJN/Ujjain Junction (8 PFs)

sonofgalaxy   50 blog posts
Entry# 2356925            Tags   Past Edits
Railways to start prelim work on Ujjain-Fatehabad route
The Railways will begin earthwork for the Ujjain-Fatehabad gauge conversion project. Railways officials said that the earthwork is estimated to cost Rs 4 crore will take about 18 months to complete.
Officials said this 22km long section is part of a larger gauge conversion project of Indore-Fatehabad-Ujjain rail section, the estimated cost of which is Rs 120 crore. "Conversion of this whole section will reduce rail connectivity distance by around 400 km and this project is expected to be completed in 2018," said a spokesman
...
more...
with Ratlam division of the western railways.
The existing meter gauge rail lines on this 22 km section will be replaced with a broad gauge rail line. The earthwork will include soil exploration and a survey to determine soil types with a view to identify its suitability to design the foundation for the rail lines," said an official. He added that the earthwork will also help avoid troublesome spots, unstable hill sides and swampy and rock areas.
The Railways has already completed the Indore-Fatehabad section and work for the remaining 22km section between Ujjain and Fatehabad is now set to begin.
The Railways had closed this 134-year old meter gauge rail section between Fatehabad-Ujjain and Fatehabad-Indore in February, 2014.
The conversion of this rail section will reduce travel time by around half an hour. It will also reduce travel distance by around 20 km. It takes more than two hours for a train to travel from Indore to Ujjain. After the MG section is converted into BG, trains will take only one and a half hour to travel from Ujjain to Indore.

  
1586 views
Jul 19 2017 (20:43)
Bina Jn   468 blog posts
Re# 2356925-1            Tags   Past Edits
Ye 19 kms ka GC hai FTD to Shipra bridge ( Ujjain)

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sun Oct 29
Trains with ARP 15 Dep on: Fri Nov 3
Trains with ARP 30 Dep on: Sat Nov 18
Trains with ARP 120 Dep on: Fri Feb 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.