Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Oct 21, 2017 08:50:20 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Oct 21, 2017 08:50:20 IST

Blog Entry# 2357757
Posted: Jul 20 2017 (12:49)

1 Responses
Last Response: Jul 20 2017 (12:49)
  
Rail News
0 Followers
564 views
Major Accidents/DisruptionsECoR/East Coast  -  IR Press Release 
Jul 20 2017 (12:48)   TRAIN SERVICES RESUMED IN TITLAGARH-RAYAGADA RAILWAY SECTION

Rail Fanning~   166 news posts
Entry# 2357757   News Entry# 308978         Tags   Past Edits
Finally, after a gruelling struggle against all odds, the rail traffic between Rayagada and Theruvali has been restored with some restrictions. The speed on the approach of the bridges is restricted to 10 kmph with extreme cautious lookout for any warning sign.

Work on the pillars of the bridge still continuing. Hundreds of labourers and dozens of machines are on the job. The traffic resumption has been done due to large number of trains getting cancelled/run on diverted routes, etc. Still, we cannot say that normal train operations have resumed.
...
more...


One bridge is lying damaged and the other one has just been made fit enough to run with highly restricted speed. Not all trains will be able to pass through the route as the route capacity to run trains has got squeezed.

Some trains may remain cancelled for some time while some other trains may be run on diverted routes. A few important trains will, however, resume service now. Situation under watch. Position being updated from the site regularly.

General Manager Sri Umesh Singh, who was camping there continuously, left the site only after the first engine trial on the repaired bridge was done successfully.

CANCELLATION & SHORT TERMINATION OF TRAINS

TRAINS TO REMAIN CANCELLED TILL FURTHER ADVICE
01.58527/58528 Raipur-Visakhapatnam-Raipur Passenger

02.58529/58530 Durg-Visakhapatnam-Durg Passenger

03.58301/58302 Sambalpur-Koraput-Sambalpur Passenger

04.18301/18302 Sambalpur-Rayagada-Sambalpur Inter City

05.18107/18108 Rourkela-Koraput-Rourkela Express

06.18211/18212 Durg-Jagadalpur-Durg Express from Durg

07.58131/58132 Rourkela-Puri-Rourkela Passenger

DIVERSION OF TRAINS VIA BILASPUR-RAIPUR-NAGPUR-BALLHARSA TILL FURTHER ADVICE:
01.12835/12836 Hatia-Ernakulam-Hatia Express from both the directions.

02.12376/12375 Asansol-Chennai-Asansol from both the directions.

03.12889/12890 Tata-Yesvantpur-Tata Express from both the directions.

04.18637/18638 Hatia-Yesvantpur-Hatia Express from both the directions.

05.22837/22838 Hatia-Ernakulam-Hatia Express from both the directions.

06.18111/18112 Tata-Yesvantpur-Tata Express from both the directions.

SHORT TERMINATION/ORIGIN TILL FURTHER ADVICE:

01.18005 Howrah-Jagadalpur Samaleswari Express will be short terminated at Titlagarh.

02.18006 Jagadalpur-Howrah from Titlagarh instead of Jagadalpur

Services 18005/18006 Howrah-Jagadalpur-Howrah Samaleswari Express will remain cancelled from both the directions till further advice.


  
7239 views
Jul 20 2017 (12:49)
Rail Fanning~   2793 blog posts
Re# 2357757-1            Tags   Past Edits
As per the news article 'Not all trains will be able to pass through the route as the route capacity to run trains has got squeezed., so it would still take some time more for restoration !!!

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Oct 31
Trains with ARP 15 Dep on: Sun Nov 5
Trains with ARP 30 Dep on: Mon Nov 20
Trains with ARP 120 Dep on: Sun Feb 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.