Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Dec 12, 2017 00:46:29 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Dec 12, 2017 00:46:29 IST

Blog Entry# 2366628
Posted: Jul 30 2017 (19:35)

1 Responses
Last Response: Jul 30 2017 (19:35)
  
Rail News
0 Followers
731 views
Commentary/Human InterestSR/Southern  -  
Jul 30 2017 (09:04)   ‘Hanging’ flyover

rdb*^   132893 news posts
Entry# 2366628   News Entry# 310040         Tags   Past Edits
Project designed 8 years agoyet to make progress
The flyover project conceptualised by Highways Department over the railway level crossing no: 131 at Parapalayam about eight years ago, is yet to make any progress. All one can see now is the completed 37-metre-long portion above the track, built by the Railways, out of the total 330-metre-long flyover planned to provide connectivity between Uthukuli road and New Bus Stand area. The Rs. 18-crore project, which still lies in the nascent stage, was originally planned to be completed in 18 months. Even the land acquisition process was yet to be completed and uncertainty prevails on the commencement of the works. Highways department sources told The Hindu that of the total project cost, Rs. 4
...
more...
crore was earmarked for acquiring land from 24 persons holding patta in the project area on both sides of the railway track.
Rail activist G. S. Kohilan said that the delay would add to the project cost due to escalation in the prices of construction materials. “Revision in estimates means unnecessary additional spending of tax payers’ money”, Mr. Kohilan said.
When contacted, the Highways Department sources attributed the delay in work to administrative issues and for some extent to a civil case. “We are planning to take up the work at the earliest”, said the officials.

  
984 views
Jul 30 2017 (19:35)
gopalfirst   81 blog posts
Re# 2366628-1            Tags   Past Edits
sir, in bangalore aria: old byappanahalli [STATION CODE BYPL] since 2011 april is pending sir, ROB 70% finished i mean [one side up road mean ramp, top are finished but another side down road mean ramp and side walls is pending sir, what can you say sir???

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 22
Trains with ARP 15 Dep on: Wed Dec 27
Trains with ARP 30 Dep on: Thu Jan 11
Trains with ARP 120 Dep on: Wed Apr 11

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.