Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Nov 22, 2017 15:02:41 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Nov 22, 2017 15:02:41 IST

Blog Entry# 2367764
Posted: Aug 01 2017 (09:53)

6 Responses
Last Response: Aug 03 2017 (14:03)
  
★  General Travel
0 Followers
3024 views
Aug 01 2017 (09:53)   54086/Rewari-Delhi Passenger (UnReserved) | RE/Rewari Junction (8 PFs)

Miss World from Haryana 😊^~   1831 blog posts   5621 correct pred (77% accurate)
Entry# 2367764            Tags   Past Edits
**Attention**
Update of Rewari-Delhi electrification as on 31/07/2017
-- Poles and wiring done upto the point where Re-Dli and Re-Jhajjjar line separates (see in pic)
-- for poles digging work is doing at 3 places , at 2 places it looks work was starting of day itself , at one place about 25-30 holes were made for poles and working staff was doing at
...
more...
all 3 places.
**Hope the work will complete as soon as possible.**

1 posts - Tue Aug 01, 2017

  
1763 views
Aug 01 2017 (14:47)
Electrified100~   109 blog posts   6 correct pred (75% accurate)
Re# 2367764-4            Tags   Past Edits
Yeah March next year tak CRS due hai! Gurgaon bhi Under Wire aa jaayega!!! :D

  
1702 views
Aug 01 2017 (17:14)
Indian railways Project Swarn is great idea^~   87615 blog posts   5325 correct pred (78% accurate)
Re# 2367764-5            Tags   Past Edits
2017 ker do usko.

  
1665 views
Aug 01 2017 (17:14)
Indian railways Project Swarn is great idea^~   87615 blog posts   5325 correct pred (78% accurate)
Re# 2367764-6            Tags   Past Edits
6 mnth delay confirm h.

  
2361 views
Aug 03 2017 (08:43)
Bhiwani*^   545 blog posts   198 correct pred (76% accurate)
Re# 2367764-7            Tags   Past Edits
Delhi - Rewari #electrification work will start from 8 Aug 2017

  
1875 views
Aug 03 2017 (14:03)
Electrified100~   109 blog posts   6 correct pred (75% accurate)
Re# 2367764-8            Tags   Past Edits
Haha, newspaper waalo ne Bandikui ka bhi electrification kar diya!

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Dec 2
Trains with ARP 15 Dep on: Thu Dec 7
Trains with ARP 30 Dep on: Fri Dec 22
Trains with ARP 120 Dep on: Thu Mar 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.