Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Nov 20, 2017 03:01:40 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Nov 20, 2017 03:01:40 IST

Blog Entry# 2368622
Posted: Aug 02 2017 (09:10)

19 Responses
Last Response: Aug 10 2017 (01:59)
  
General Travel
0 Followers
1784 views
Aug 02 2017 (09:10)  

Mohit~   337 blog posts
Entry# 2368622            Tags   Past Edits
Agar Delhi Mumbai route via Alwar and Jaipur electrified doubled aur track upgrade ho jaaye Toh Kya Yeh route via kota se better ho sakta hai?

1 posts - Wed Aug 02, 2017

6 posts - Thu Aug 03, 2017

6 posts - Fri Aug 04, 2017

1 posts - Sat Aug 05, 2017

  
537 views
Aug 05 2017 (21:53)
Mohit~   337 blog posts
Re# 2368622-17            Tags   Past Edits
No via Alwar and Jaipur it is 27km shorter Than existing dee bets garibrath route

  
466 views
Aug 05 2017 (22:07)
Neel Ashar^~   4403 blog posts   81 correct pred (65% accurate)
Re# 2368622-18            Tags   Past Edits
Yeah you're right. GR runs via Gandhinagar Capital.

  
431 views
Aug 05 2017 (22:40)
Mohit~   337 blog posts
Re# 2368622-19            Tags   Past Edits
Dee AWR bdts is 1404km long which is only 20 km long than kota route.IR should focus on Delhi Jaipur Ahemdabad Mumbai route rather than Delhi Mathura Kota Mumbai route.Since Delhi Mumbai route via Jaipur Ahemdabad Connects major cities like Ahemdabad Jaipur Ajmer etc.

  
362 views
Aug 10 2017 (01:37)
rahultup380   175 blog posts   1 correct pred (100% accurate)
Re# 2368622-20            Tags   Past Edits
But already that route is more focused for Delhi-Mumbai trains and trains coming from Kerala,Konkan,Maharashtra pass via Vadodara and take loco change and you know along side of TVC Rajdhani, Mumbai Rajdhani,Goa Rajdhani many trains take that route only. Many trains coming from Konkan,Kerala and going towards Bikaner and Jodhpur and adding more trains towards Delhi will congest that route according to me. For that Railways should think of starting more Jaipur,Ajmer trains via Ahmedabad.The maximum speed which Mumbai Rajdhani catches is almost 140km/hr and you cannot expect the same speed in Ahmedabad-Ajmer-Jaipur-Delhi route max is 120km/hr.

  
350 views
Aug 10 2017 (01:59)
rahultup380   175 blog posts   1 correct pred (100% accurate)
Re# 2368622-21            Tags   Past Edits
Leave future for a minute now..
Mumbai-Ahmedabad is a Double Electric Line and
Ahmeadbad-Ajmer Single Diesel
Ajmer to Delhi Diesel Double except Alwar-Bandikui Single Diesel
Now
New
...
more...
Delhi-Faridabad Electric Quadruple Line
Faridabad-Mathura- Triple Electric
Mathura-Kota Double Electric.
This is the reason more trains are preferred on that route because of 4 lines and 3 lines and Delhi-Tilak Bridge-Sivaji Bridge 5th and 6 th line under construction.
Yes,in future if railways want they can add more trains via Ahmedabad but to decongest Mathura route is better. Instead Short routes trains are better Ahmedabad-Jaipur, Ahmadabad -Delhi ,Mumbai-Jaipur,Mumbai-Ajmer.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Nov 30
Trains with ARP 15 Dep on: Tue Dec 5
Trains with ARP 30 Dep on: Wed Dec 20
Trains with ARP 120 Dep on: Tue Mar 20

  
  
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.