Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Sep 24, 2017 17:53:58 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Sep 24, 2017 17:53:58 IST

Blog Entry# 2369016  
Posted: Aug 02 2017 (16:05)

23 Responses
Last Response: Aug 12 2017 (14:44)
  
Rail News
0 Followers
2222 views
Aug 02 2017 (15:13)   Railways eyes Rs 26k crore savings in energy costs over 10 years through electrification

Jayashree ❖ Amita*^   37794 news posts
Entry# 2369016   News Entry# 310423         Tags   Past Edits
The Railways has set a target of electrifying 24,400 km of routes by 2022 to drastically decrease the use of diesel for reducing energy costs and greenhouse gas emissions. The target will be announced by Rail Minister Suresh Prabhu on August 4.
The Indian Railways has chalked out a blueprint to electrify its network over the next ten years that will result in an estimated total savings of Rs 26,400 crore on energy costs, a ministry official said. The energy bill of the public transporter is around Rs 32,000 crore a year, of which diesel accounts for Rs 16,000-18,000 crore.
With
...
more...
electrification of major rail routes, the ministry estimates annual saving of the tune of Rs 3,300 crore, the official said. The Railways has set a target of electrifying 24,400 km of routes by 2022 to drastically decrease the use of diesel for reducing energy costs and greenhouse gas emissions. The target will be announced by Rail Minister Suresh Prabhu on August 4, the ministry official said.
Currently, only about 42 per cent of total rail network is electrified. To fast-track the pace of electrification Railways have joined hands with three PSUs – IRCON, RITES and PGCIL. During the last three years and for 2017-18, a total of 93 railway electrification projects along 16,815 kms have been included in the Budget at an estimated cost of Rs 17,165 crore.

3 posts - Wed Aug 02, 2017

4 posts - Fri Aug 04, 2017

1 posts - Sat Aug 05, 2017

1 posts - Tue Aug 08, 2017

2 posts - Thu Aug 10, 2017

7 posts - Fri Aug 11, 2017

  
739 views
Aug 11 2017 (11:16)
rahultup380   174 blog posts   1 correct pred (100% accurate)
Re# 2369016-20            Tags   Past Edits
At present SR have highest number of WAP 4 in form of ED shed around 115 and RPM have 66 WAP 7 and also RPM and AJJ have much amount of Eloco. But the thing is these locos are being extensively used to haul trains within Kerala and Karnataka. Also Tamil Nadu and Kerala have more kms of electric lines than Karnataka and you should know that almost 7/10 of a train in SR use Eloco. But we still have some trains like 16332 using eloco upto Guntakal, Jayanti Janta using Eloco from CAPE to Guntakal. We have many trains within Kerala using using ED locos from Trivandrum,Ernakulam to Shoranur. 4 trains use ED,RPM locos upto Mangalore also. All the trains from Ernakulam,Coimbatore,TVC,Shoranur to Chennai,Delhi, Kolkata and Guwahati (till Rake reversal takes places)use SR loco.
ED,RPM,AJJ
...
more...
are busy extensively now if TSS completes at Tirur what will happen to Eloco,and if Erode-Karur-Trichy and Salem-Karur-Dindigul gets completed all trains except few will get eloco. Surely all the trains will get Eloco in the route Kurla cannot get Eloco till 2020-2021.
1.Dharmapuri line is Diesel line and work for electrification hasn't started
2.RVNL,when they will complete the work who knows.

  
606 views
Aug 11 2017 (11:40)
6 Years of IRI*^~   9872 blog posts   497 correct pred (74% accurate)
Re# 2369016-21            Tags   Past Edits
Yes , SCR is very quick. They have given E loco so soon

  
681 views
Aug 11 2017 (11:46)
6 Years of IRI*^~   9872 blog posts   497 correct pred (74% accurate)
Re# 2369016-22            Tags   Past Edits
So how come u say CBE RJT cant get E loco ? With allotment in RPM rising up. AJJ have been given the locos of RPM as well. SR is getting a handful of E locos.
Once GTL ELS is commissioned , it can be done very easily. I'm very much aware of loco usage of SR trains. SR is rated as the worst in terms of loco usage as well. The earlier plan was to run E loco all the way till CSTM with D loco hauling in Daund to Wadi with E loco as dead for all Mumbai Chennai trains. The plan has been paused for a while.

  
593 views
Aug 12 2017 (10:23)
vipinpv   177 blog posts
Re# 2369016-23            Tags   Past Edits
TVC up to MAQ is in SR, so SR has to provide loco from their sheds only. unless of course SR decides that they need a dedicated shed to serve South TN, West coast ED/RPM/AJJ would be doing that work. Another aspect that would be taken into consideration is progress of konkan railway electrification, if that gets executed significantly faster the necessity for a dedicated shed on west coast increases further.

  
604 views
Aug 12 2017 (14:44)
rahultup380   174 blog posts   1 correct pred (100% accurate)
Re# 2369016-24            Tags   Past Edits
I am saying that if at all in future, Mangalore line starts getting Eloco all trains from TVC,ERS be it Rajdhani,Duronto,will start geting eloco. Now the only electrification part will be left is Mangalore-Verna. Since Roha-Verna section is sanctioned to L&T,then in future all trains will get Eloco of SR unless or otherwise new loco shed is not planned within Kerala, all this train will get Eloco just like Himsagar,Millenium,Swarna Jayanti,Kerala Express, Vivek,Guwahati Express, and much more trains needless to say of ED,RPM,AJJ shed.
Right now what I think is there is some problems in building of TSS at Tirur side.
But
...
more...
by 2019, the trains going through this route will get end to end Eloco
Erode-Karur-Trichy-Thanjavur-Karaikal
Erode-Karur-Trichy-Villupuram-Chennai Egmore
Erode-Karur-Dindigul-Tuticorin/Nagercoil
Salem-Namakkal-Karur-Dindigul
Coimbatore-Vijayawada-Itarsi-Jabalpur-Allahabad.
Mangalore-Coimbatore-Vijayawada-Delhi-Jind-Dhuri-L udhiana-Shri Mata Vaishno Devi Katra.
Coimbatore-Malda town-New Jalpaiguri.
By 2020-2021
Coimbatore-Guwahati
Madgaon-Ahmedabad -Jaipur-Rewari -Delhi
Madgaon-Roha-Panvel-Vadodara-Delhi
Wouldn't comment on projects being undertaken by RVNL,because they are sleeper cells.

Trichy-Mayiladuthurai -Chennai
Pune-Guntakal doubling/electrification
Palanpur-Ajmer is being taken combined by NWR/RVNL
Projects being undertaken by
1.Delhi-Jaipur-Ajmer by L&T
2.Erode-Karur-Trichy and Salem-Karur-Dindigul by Kalpataru power
3.Roha-Verna by L&T
4.Trichy-Thanjavur -Thiruvarur-Karaikal by EMC-Quatro Joint Venture

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Oct 4
Trains with ARP 15 Dep on: Mon Oct 9
Trains with ARP 30 Dep on: Tue Oct 24
Trains with ARP 120 Dep on: Mon Jan 22

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.