Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 25, 2017 15:08:27 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 25, 2017 15:08:27 IST

Blog Entry# 2369321
Posted: Aug 02 2017 (22:18)

1 Responses
Last Response: Aug 02 2017 (22:18)
  
Rail News
0 Followers
422 views
Commentary/Human Interest
Aug 02 2017 (22:18)   L&T bags Mauritius metro project

rdb*^   132881 news posts
Entry# 2369321   News Entry# 310470         Tags   Past Edits
After bagging Riyadh and Doha metro, engineering and construction major Larsen & Toubro (L&T) has bagged ₹ 3,375-crore order from Mauritius government-led Metro Express Limited to design and build an Integrated Light Rail-based Urban Transit System in the African island nation.
“We are delighted that we have been able to carry our credentials as the foremost builders of metro and light rail transport systems in India and the Middle East to Africa too,” said S.N. Subrahmanyan, CEO & Managing Director, L&T, describing this win.
“We are extremely grateful to the Government of Mauritius
...
more...
for having reposed faith in our expertise and we are confident of meeting their expectations and requirements. The new light rail system will significantly transform the way Mauritius will commute in the future and will also bring in economic benefits along the route,” said Mr. Subrahmanyan.
The 26-km route will connect Curepipe to Immigration Square in Port Louis and will feature 19 stations, two of which will be elevated stations. The project is scheduled to be completed in 48 months, L&T commits to complete and deliver a priority section of 13 km in 24 months.
The project that has been won against competition and will be fully funded through a Government of India grant and Line of Credit.
“This order is perfectly in sync with our strategy to expand L&T’s Railways business into markets beyond India and we are extremely happy to have found a foothold in the African continent,” said Rajeev Jyoti, CEO, Railways Strategic Business Unit that resides within the Transportation Infrastructure business vertical of L&T Construction, the construction arm of L&T.
“We are already building the Riyadh and Doha metros apart from 17 other metros in India and with this project we are looking forward to spreading our influence in Africa too,” said Mr. Jyoti.

  
1055 views
Aug 02 2017 (22:18)
rdb*^   31851 blog posts   410682 correct pred (82% accurate)
Re# 2369321-1            Tags   Past Edits
Its great thing

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 5
Trains with ARP 15 Dep on: Sun Dec 10
Trains with ARP 30 Dep on: Mon Dec 25
Trains with ARP 120 Dep on: Sun Mar 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.