Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Nov 20, 2017 07:44:45 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Nov 20, 2017 07:44:45 IST

Blog Entry# 2369526
Posted: Aug 03 2017 (10:07)

3 Responses
Last Response: Aug 05 2017 (15:28)
  
★★★  Info Update
Aug 03 2017 (10:07)   GGVT/Gangavathi

Foamer~   1995 blog posts
Entry# 2369526            Tags   Past Edits
Ginigera - Raichur New Line.
-
New Station: Gangavathi.
-
A major milestone will be achieved by this year end when one of the biggest towns of Karnataka, which was hitherto not connected by rail
...
more...
link, will be on the IR map :)
-
1. I visited Gangavathi yesterday to see the progress of the new station. This line's Ginigera - Chikkabenakal Section was inaugurated this year /blog/post/2217215.
2. From Chikkabenakal onwards track laying has been completed till the outskirts of Gangavathi about 2 Kms from the station.
3. Ground work, including the railway bridge over Gangavathi - Raichur highway, for the track laying is complete upto the station and also ballast and sleepers are ready too.
4. The station building is under construction. Just like other stations like Chikkabenakal /blog/post/2217215, this station will be multi-storied due to the elevated track section.
5. The foundation for the PFs are under construction can be seen, and whole line till Gangavathi will be ready in a few months. By this year end it, hopefully it will be inaugurated.
6. Further on, I learnt, the earth work and elevated track bed, RoBs, RuBs is almost completed upto some 2 Kms beyond Karatagi - the next major town, which is part of Gangavathi Taluk.
So that means its just some 18 Kms from Sindhanuru - the biggest town on the complete line. That would take another year, perhaps.
7. The entire line is slated for completion by 2020 (officially) - /blog/post/2251228.
-
All above info is based on what I could see and also glean from the locals.
-

  
2474 views
Aug 03 2017 (14:49)
knkprasad956*^~   2316 blog posts
Re# 2369526-1            Tags   Past Edits
Thanks for updates

  
1940 views
Aug 05 2017 (11:14)
Rani Chennamma Queen of SWR~   2530 blog posts   793 correct pred (68% accurate)
Re# 2369526-2            Tags   Past Edits
Great coverage bro :)
Any info on any new trains for Ginigera-Chikkabenakal ??

  
1867 views
Aug 05 2017 (15:28)
Foamer~   1995 blog posts
Re# 2369526-3            Tags   Past Edits
No, no info of new trains.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Nov 30
Trains with ARP 15 Dep on: Tue Dec 5
Trains with ARP 30 Dep on: Wed Dec 20
Trains with ARP 120 Dep on: Tue Mar 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.