Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 25, 2017 13:31:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 25, 2017 13:31:07 IST

Blog Entry# 2370666
Posted: Aug 04 2017 (13:13)

2 Responses
Last Response: Aug 04 2017 (14:49)
  
Rail News
0 Followers
414 views
Other NewsNR/Northern  -  
Aug 04 2017 (11:00)   First Phase of Redevelopment of Safdarjung Railway Station by 2019

Jayashree ❖ Amita*^   38182 news posts
Entry# 2370666   News Entry# 310662         Tags   Past Edits
New Delhi: The first phase of redevelopment of Safdarjung railway station here is expected to be complete by January 2019, the Railway Ministry said on Thursday.
The Indian Railway Construction Company Limited (IRCON), a public sector undertaking (PSU) and the Rail Land Development Authority (RLDA), a statutory authority under the Ministry of Railways, on Thursday signed a memorandum of understanding to implement the project.
"IRCON will carry out design, construction and marketing of the project. The Phase-I of the project will come up on the Moti Bagh side of the station and is
...
more...
targeted for completion by January 2019," a statement from the ministry said.
They are expected to leverage the commercial potential of the railway land around the station as well as the air space above it.
The station is proposed to be developed on a self-financing model for which finance will be raised through marketing of the commercial built-up area that will be developed on the surplus railway land and air space as part of the station development project.
The land and the constructed buildings will continue to remain under the ownership and control of the RLDA and only the commercial built-up area will be leased for up to 45 years by RLDA, the statement said.

  
896 views
Aug 04 2017 (13:13)
Sandeep Vickey   6009 blog posts   1561 correct pred (69% accurate)
Re# 2370666-1            Tags   Past Edits
How to add Images during news posts ?

  
753 views
Aug 04 2017 (14:49)
Jayashree ❖ Amita*^   13581 blog posts   112088 correct pred (78% accurate)
Re# 2370666-2            Tags   Past Edits

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 5
Trains with ARP 15 Dep on: Sun Dec 10
Trains with ARP 30 Dep on: Mon Dec 25
Trains with ARP 120 Dep on: Sun Mar 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.