Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Nov 24, 2017 11:25:51 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Nov 24, 2017 11:25:51 IST

Blog Entry# 2371388
Posted: Aug 05 2017 (07:01)

1 Responses
Last Response: Aug 05 2017 (07:01)
  
Rail News
0 Followers
333 views
Commentary/Human InterestDMRC/Delhi Metro  -  
Aug 05 2017 (07:01)   METRO TRAIN CROSSES DELHI METROS HIGHEST POINT AT DHAULA KUAN

rdb*^   132877 news posts
Entry# 2371388   News Entry# 310768         Tags   Past Edits
METRO TRAIN CROSSES DELHI METROS HIGHEST POINT AT DHAULA KUAN
A Metro train passed through Delhi Metro’s highest point at Dhaula Kuan today for the first time as part of the preparations for commencement of trial runs between Mayapuri and South Campus on the upcoming Majlis Park – Shiv Vihar (Pink) corridor.
The Metro train crossed Dhaula Kuan at a height of 23.6 metres (as high as a seven storey building) to reach South Campus from Mayapuri covering a distance of 6.8 kilometers. The full fledged  trials on this section will commence in
...
more...
a few days time.
During this journey, various functional aspects of the new rolling stock (trains) were tested prior to the beginning of signaling trials. Trial runs on a 6.5 km stretch between Shakurpur and Mayapuri are already in progress on the pink line since last month.
The height of the viaduct at Dhaula Kuan is 23.6 mtrs and it is the highest point of Delhi Metro so far surpassing Karkarduma where the Metro passes at a height of 19 mtrs above the ground. The construction of this section was a major engineering challenge since the viaduct had to pass above the airport line viaduct as well as flyovers at the Dhaula Kuan intersection.
The launching operation above the Airport line was done only during the non-operating hours (i.e between 12.30 AM till 4AM) to avoid any disruption to the traffic on Airport line. Launching work started only after getting all clearances from Operation & Maintenances (O&M) department of the Airport line. A diversion road also was constructed so that there was no inconvenience to the road users during erection. 
The Majlis Park – Shiv Vihar corridor, also known as the Pink line is a 59 kilometre line corridor mostly covering the national capital’s arterial Ring Road. After commissioning, the line will emerge as one of Delhi Metro’s lifelines with 10 interchange stations.
AD/ED(CC)/DMRC

  
800 views
Aug 05 2017 (07:01)
rdb*^   31851 blog posts   410227 correct pred (82% accurate)
Re# 2371388-1            Tags   Past Edits
wow great DMRC, now over the Airport line

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 4
Trains with ARP 15 Dep on: Sat Dec 9
Trains with ARP 30 Dep on: Sun Dec 24
Trains with ARP 120 Dep on: Sat Mar 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.