Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Nov 21, 2017 13:55:07 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Nov 21, 2017 13:55:07 IST

Blog Entry# 2371649
Posted: Aug 05 2017 (11:54)

1 Responses
Last Response: Aug 05 2017 (11:54)
  
Rail News
0 Followers
352 views
Commentary/Human InterestNFR/Northeast Frontier  -  
Aug 04 2017 (18:48)   Double Tracking of North East Frontier Railway

rdb*^   132872 news posts
Entry# 2371649   News Entry# 310724         Tags   Past Edits
              Doubling is taken up when the routes are saturated.  They are taken up in phases depending upon traffic density. As on date, 5 doubling projects have been taken up in North Eastern Region covering 472 km of route length.  Details of these projects are as under: S.No. Name of project Latest Anticipated Cost (Rs in crore) Outlay 2017-18 (Rs in crore) Remarks 1. Lumding-Hojai (45 km) 364 100 Earthwork and bridge works have been taken up. 2. New Bongaigaon-Kamakhya via Rangiya (142 km) 1888 10 Work included in Budget 2013-14 subject to requisite Government approvals. 3. Bongaigaon-Goalpara-Guwahati (176 km) 2232 250 Contracts for earthwork, major & minor bridges awarded. 4. Digaru-Hojai (102 km) 871 150 Earthwork, major & minor bridges have been taken up. 5. Saraighat Bridge doubling (7 km) 888 1 The work has been included in Budget 2017-18 subject to requisite approvals. FLS has been sanctioned.  ...
more...
With a view to providing faster and seamless rail connectivity on electric traction of North East States falling in North East Frontier Railway, electrification of Barauni-Katihar-Guwahati including Katihar-Barsoi (836 route kilometers) and Kumedpur-Malda Town-Singhabad & Pakur-Malda (153 route kilometers) has been sanctioned. The work has been entrusted to Central Organisation for Railway Electrification (CORE) and Rail Vikas Nigam Limited (RVNL) for execution.   In addition to above, 04 Railway Electrification projects which falls in North East Frontier Railway have also been included in Budget 2017-18 subject to mandatory approvals and sanctions. S.No. Project Route Kilometers Anticipated cost (Rsin crores) 1. Guwahati-Dibrugarh via Tinsukia and Simaluguri-Dibrugarh 656 890.36 2. New Bongaigaon-Agthori via Rangiya 143 137.90 3. Raninagar-Jalpaiguri-Samuktala Road (2nd line) 129 123.19 4. New Bongaiaon-Golpara-Kamakhiya 175 282.23       Electric traction has started in Katihar Yard on North East Frontier Railway after commissioning of  Barauni-Katihar section on electric traction on 31.03.2017.  Further, Katihar-Kumedpur Malda Court (117 Route Kilometers) is planned for commissioning on Electric traction during 2017-18.   This Press Release is based on the information given by the Minister of State for Railways Shri Rajen Gohain in a written reply to a question in Rajya Sabha on 04.08.2017 (Friday). ****   AKS/MKV/ENS/PM  
 
(Release ID :169623)

  
589 views
Aug 05 2017 (11:54)
a2z~   2186 blog posts
Re# 2371649-1            Tags   Past Edits
With doubling and electrification works in NFR in progress, in future, we can expect higher avg speeds of trains in the zone, at par with other zones.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 1
Trains with ARP 15 Dep on: Wed Dec 6
Trains with ARP 30 Dep on: Thu Dec 21
Trains with ARP 120 Dep on: Wed Mar 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.