Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Sep 23, 2017 20:24:12 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Sep 23, 2017 20:24:12 IST

Blog Entry# 2372812  
Posted: Aug 06 2017 (16:52)

1 Responses
Last Response: Aug 06 2017 (16:52)
  
Rail News
0 Followers
302 views
New Facilities/TechnologySR/Southern  -  
Aug 06 2017 (07:49)   Southern Railway extends two trains to Tambaram as coaching terminal works comes to an end

rdb*^   132538 news posts
Entry# 2372812   News Entry# 310895         Tags   Past Edits
Chennai: Chennai's railway network will enter a new phase on Monday. Southern Railway has announced that two pairs of weekly trains will originate and terminate from Tambaram, which has been designated as the third coaching terminal of the city after Central and Egmore.
The commissioning works are almost entirely over with only a few minor works remaining, Naveen Gulati, Divisional Railway Manager of Chennai division, told TOI.
Train number 15630 / 15629 Guwahati - Chennai Egmore - Guwahati weekly express trains and Train No.15930 / 15929 Dibrugarh - Chennai Egmore - Dibrugarh weekly
...
more...
express trains will start and originate at Tambaram from August 7 to 31 on a trial basis.
"Both trains will be maintained at the Tambaram terminal," Gulati said.
Tambaram-Guwahati express will start at 9:45pm from Tambaram (on Mondays) and reach Egmore at 10:15pm. It will have a stoppage of 15 minutes. In the reverse direction, the train will arrive at Egmore at 8:05pm (Sunday) and stop for 35 minutes. It will reach Tambaram at 9:15pm.
The same timings will apply for the Dibrugarh-Egmore-Dibrugarh weekly express train which runs on Thursday from Chennai and returns on Wednesday from Dibrugarh.
Tambaram's maintenance shed has two pit lines, where the coaches can be washed. This is the first phase of converting the station into a terminal and a second phase envisages construction of more pit lines and other facilities.
It is an essential project because the maintenance sheds in Gopalapuram yard (Egmore) and Basin Bridge (Chennai Central) are saturated. For starting new trains to southern districts, which has a huge demand, new maintenance facilities are needed and Tambaram is a step in that direction.
Sources say the zone has sent a proposal to start two new trains from Tambaram station through Egmore. Officials are not too keen to start trains to southern districts from Tambaram as passengers inside Chennai Corporation limits, especially in north and central Chennai, are opposed to the idea.

  
1461 views
Aug 06 2017 (16:52)
a2z~   2033 blog posts
Re# 2372812-1            Tags   Past Edits
At last Chennai gets its third terminal after several decades, may be more than century! Friends pl. correct me if l'm wrong

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Oct 3
Trains with ARP 15 Dep on: Sun Oct 8
Trains with ARP 30 Dep on: Mon Oct 23
Trains with ARP 120 Dep on: Sun Jan 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.