Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Sep 19, 2017 19:17:03 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Sep 19, 2017 19:17:03 IST

Blog Entry# 2373076  
Posted: Aug 06 2017 (22:42)

1 Responses
Last Response: Aug 17 2017 (17:07)
  
General Travel
0 Followers
973 views
Aug 06 2017 (22:42)   NED/Hazur Sahib Nanded (4 PFs)

phanipeddapalli13   62 blog posts
Entry# 2373076            Tags   Past Edits
The newly announced H.S.Nanded-Nagpur Express by our Honourable Railway Minister Shri Suresh Prabhakar Prabhu on June 3rd 2017 at Nanded Railway station,should be made to run Via Mudkhed-Nizamabad-Peddapalli-Balharshah-Majri-Sewa gram,Because there are no direct trains from Nizamabad and Basara towns to Nagapur city.Suppose if this train is made to run Via this New route,It will be helpful for the passengers of North Telangana Districts People namely Nirmal,Nizamabad,Jagityala,Karimnagar,Peddapalli,M ancherial and Komaram Bheem Asifabad districts people to go to Nagapur for Business and Job purpose.From these North Telangana districts people mainly go to Nagapur for Orange fruit and Cotton business,And parallely at the same time for Nagapur,Wardha and Chandrapur districts of Vidarbha Region of Maharastra state will have direct connectivity with "Basara" Pilgrimage to visit the famous "Saraswathi Devi temple".I think for Nanded people this route will be circutious when compared to the current route to Nagapur Via Mudkhed-Adilabad-Majri-Sewagram.I...
more...
think the proposed route via MUE-NZB-PDPL-BPQ-MJRI-SEGM will be longer by 202kms.But no problem instead it will add a better connectivity between the districts of North Telangana with Vidarbha region in Maharastra state.Let us hope for the best.
If they think the above mentioned route is circutious for Nanded people to go to Nagapur Via NZB and PDPL,Then see one example that H.S.Nanded-LTT Mumbai-H.S.Nanded 11012/11 Weekly Express Via PAU-PBN-PRLI-LTRR-KWV-DD-PUNE-KJT-KYN is also circutious because this train is additionally travelling for 140kms more when compared to the shortest route Via PAU-PBN-AWB-MMR-KYN and One more Example is that H.S.Nanded-Pune-H.S.Nanded 12730/29 Bi-Weekly Superfast Express Via PAU-PBN-AWB-MMR-PB-DD is also travelling for 108kms longer when compared to the shortest route Via PAU-PBN-PRLI-LTRR-KWV-DD.
The reason why the above mentioned weekly trains from H.S.Nanded to Mumbai LTT/Pune are running in longer route when compared to the shortest route is that to connect each and every place with Mumbai City and Pune city for better connectivity.
In the same manner, why can't the newly proposed H.S.Nanded-Nagapur-H.S.Nanded Express made to be run on this proposed route Via MUE-NZB-PDPL-BPQ-MJRI-SEGM?Let us see what will happen and let us hope for the best.All the people from Basara,Nizamabad,Armoor,Jagityala,Korutla ,Karimnagar and Peddapalli should put this demand infront of railway authorities and should bring pressure on MLA's and MP's for the introduction of this new train on NZB-PDPL route.Let us try for this.

  
670 views
Aug 17 2017 (17:07)
Shubham NZB Jn~   221 blog posts   3 correct pred (75% accurate)
Re# 2373076-1            Tags   Past Edits
Instead of diverting train they may start direct train originating from NZB

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Sep 29
Trains with ARP 15 Dep on: Wed Oct 4
Trains with ARP 30 Dep on: Thu Oct 19
Trains with ARP 120 Dep on: Wed Jan 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.