Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Sep 26, 2017 00:30:30 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Sep 26, 2017 00:30:30 IST

Blog Entry# 2373969  
Posted: Aug 08 2017 (04:32)

2 Responses
Last Response: Sep 07 2017 (09:18)
  
★  Info Update
2 Followers
1020 views
Aug 08 2017 (04:32)   CRJ/Chittaranjan (3 PFs)

Karthik Iyer^~   2470 blog posts   10256 correct pred (61% accurate)
Entry# 2373969            Tags   Past Edits
Achievements in the month of July’17
1. Successful trial run of loco No. 30568 with full load of Rajdhani rake completed. This locomotive is equipped with Hotel Load Converter and is without Contactor No. 32 & Relay No. 33 in its filter cubicle. A suitable modification has been done in software to ensure proper functioning of protective action. This will achieve common filter cubicle for WAG9H and WAP7 locomotives.

2.
...
more...
Commissioning & testing of 1st unit of M/s CGL make IGBT based propulsion system in loco No. 31957.

3. Expression of Interest (EOI) floated for Manganese Steel Pins & Bushes for conventional electric locomotives.

4. Technical evaluation of tender case of IGBT Propulsion System, Centre of Excellence, Remote Monitoring System and Crew voice & video recording system (CVVRS).

5. Technical Evaluation & Recommendation of tender case of 9000 H.P. Upgradation Kit.

6. Scrutiny of design document of new entrants for DPWCS.

7. Commissioning of Hotel load converters of M/s Siemens make on Loco No. 30546 & M/s Medha on Loco Nos. 30549, 30567, 30571, & 30572.

Targets for the month of August’17

1. Commissioning & testing of 1st unit of M/s BTIL make IGBT based propulsion system in loco No. 31989.

2. Technical evaluation of tender case of Alternate Driving Gear System for WAP-5 locomotives.

3. Scrutiny of test protocol of DPWCS for new entrants.

4. Design Document approval for composite converter with Hotel Load for WAP-5 Locomotive.

5. Scrutiny and approval of design document of Hotel Load converter for WAP-7 Locomotive for new entrants.

6. Commissioning of Hotel load converters of M/s Medha make on Loco Nos. 30577, 30578 & 30580 and M/s BHEL make on 30597 & 30598.

7. Scrutiny of Proforma-A & compliance to STR of 3-ph drive Propulsion System of new entrants.

  
545 views
Sep 01 2017 (18:44)
12393 The Red Raging Star SK 12394   718 blog posts   10 correct pred (62% accurate)
Re# 2373969-1            Tags   Past Edits
Now that's achievement bro ..😎
BTW can u pls put some light on 9000HP upgradation kit ..
Today IR asked nominations for training of LP and staffs for WAG12 locos ..

  
367 views
Sep 07 2017 (09:18)
vipinpv   180 blog posts
Re# 2373969-2            Tags   Past Edits
WAG12 is the Alstom Prima class locomotive i believe. I have seen the same message on elocos "Training of LPs & LIs for WAG-12 electric loco - Nomination of staff"

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Oct 6
Trains with ARP 15 Dep on: Wed Oct 11
Trains with ARP 30 Dep on: Thu Oct 26
Trains with ARP 120 Dep on: Wed Jan 24

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2418661
    Yesterday (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.