Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Sep 27, 2017 03:28:00 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Sep 27, 2017 03:28:00 IST

Blog Entry# 2374303  
Posted: Aug 08 2017 (13:03)

6 Responses
Last Response: Aug 09 2017 (20:48)
  
★★★  Rail Fanning
0 Followers
1932 views
Aug 08 2017 (13:03)   GTL/Guntakal Junction (6 PFs) | GTL/WDM-3D/11180

శ్రీ బాలాజీ ఆలయం తిరుపతి~   281 blog posts   17 correct pred (86% accurate)
Entry# 2374303            Tags   Past Edits
Alco Diesel Shed Guntakal GTL WDM-3D #11180 Showly Running At GTL /Guntakal Junction Yard ..))
Date - 07/08/2017 Monday ..

1 posts - Tue Aug 08, 2017

  
1353 views
Aug 08 2017 (22:56)
Kitturu Rani Chennamma~   2347 blog posts   739 correct pred (70% accurate)
Re# 2374303-6            Tags   Past Edits
SBC-Nanded exp and YPR-Bidar exp could have got it till VKB too.

  
1137 views
Aug 08 2017 (23:21)
★★★BRC WAP 7😎~   1944 blog posts   2095 correct pred (89% accurate)
Re# 2374303-7            Tags   Past Edits
18519 had got ac traction btwn BZA WADI as bza vskp is single diesel line (branch line)

  
1199 views
Aug 09 2017 (15:53)
fayazdm   183 blog posts
Re# 2374303-8            Tags   Past Edits
YPR Bidar express cannot get e loco from VKB/GTL as this train passes through GTL DMM via kalluru which is a non electrified line . Now coming to SBC Nanded express Ur point is right. But I don't think there are better facilities for LSA at VKB to provide e loco's minus this train passes through Wadi B cabin ,so if at all this train is to be given AC traction ,it can be done at GTL.

  
1126 views
Aug 09 2017 (19:09)
Kitturu Rani Chennamma~   2347 blog posts   739 correct pred (70% accurate)
Re# 2374303-9            Tags   Past Edits
Bidar exp is a daily train, so diverting it via GY and running with E-loco could have been done till VKB. I think VKB can handle loco change, as Freight's used to get loco change at VKB when VKB-Wadi wasn't electrified, with e-loco going back to Sanathnagar Electric Trip Shed.

  
1092 views
Aug 09 2017 (20:48)
fayazdm   183 blog posts
Re# 2374303-10            Tags   Past Edits
Already traffic is more on GTL DMM via GY line that train's like YPR SC garibrath , YPR DEE Duronto ,YPR Solapur SF express and MAS - SNSI SF express can't be diverted to run via GY.with great difficulty Indian railways have worked out for rajdhani to find a suitable and convenient time to run on GY line just bcoz to run with e loco end to end.So probably it's just a matter of time for GTL Kalluru line get doubled and electrified .I think by the end of 2018 all this doubling work would be finished and electrification can expect by 2019 to be completed.And then u can expect the above train's to run on AC traction.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Oct 7
Trains with ARP 15 Dep on: Thu Oct 12
Trains with ARP 30 Dep on: Fri Oct 27
Trains with ARP 120 Dep on: Thu Jan 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2418661
    Sep 25 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.