Bidar exp is a daily train, so diverting it via GY and running with E-loco could have been done till VKB. I think VKB can handle loco change, as Freight's used to get loco change at VKB when VKB-Wadi wasn't electrified, with e-loco going back to Sanathnagar Electric Trip Shed.