Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Sep 23, 2017 00:34:42 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Sep 23, 2017 00:34:42 IST

Blog Entry# 2375636  
Posted: Aug 10 2017 (01:27)

1 Responses
Last Response: Aug 10 2017 (01:27)
  
Rail News
0 Followers
327 views
Other News
Aug 10 2017 (01:01)   Mumbai-Ahmedabad bullet train project yet to clear land hurdle | Mumbai news

Jayashree ❖ Amita*^   37753 news posts
Entry# 2375636   News Entry# 311224         Tags   Past Edits
Prime Minister Narendra Modi is set to lay the foundation stone for the ambitious bullet train project between Mumbai and Ahmedabad with Japanese Prime Minister Shinzo Abe next month in Sabarmati, Gujarat. However, the project has still not received land clearance from the Mumbai Metropolitan Region Development Authority (MMRDA) for the Bandra Kurla Complex (BKC) terminus.
Railway authorities are facing a tough time convincing villagers near Virar to give away their land for the project.
The land required for construction of an underground station at BKC is still under talks with the MMRDA.
...
more...
The state agency has asked the National High Speed Rail Corporation Limited (NHSRCL) to change certain specifications in the alignment of the station.
Speaking on the issue an NHSRCL official said, “The MMRDA has asked for certain changes in the alignment and the design of the underground station. We are currently studying the changes and will see how it affects the station.”
The issue of land availability continues in Virar, where railway officials were abused when they went to discuss it with villagers.
The railways have now allocated a firm to study the social impact of the project and then assess what could be done. The authorities are also thinking of offering jobs to villagers on station premises once it is built and made operational.
“There have been problems in Virar and Palghar districts as villagers are reluctant to give their land. We have hired a consultant to look into the social impact of the project in the area. We will then decide on giving the villagers jobs after the station is functional,” said a senior NHSRCL official who did not wish to be named.
The bullet train network will be built with the Japan International Cooperation Agency (JICA). The project is expected to cost Rs1,00,000 crore, of which Rs81,000 crore will be loaned from the Japanese firm.
The project is expected to begin by the end of 2018 and completed by 2023.
Meanwhile, the railways has planned 12 stations for the Mumbai - Ahmedabad bullet train service. They are BKC, Thane, Virar, Boisar, Vapi, Bilimora, Surat, Bharuch, Vadodara, Anand, Ahmedabad and Sabarmati.
The two maintenance depots will be built in Thane and Sabarmati. The authorities are also planning to link the bullet train with upcoming metros, Central and Western Railway services.
Two types of high-speed train services will operate on the route; one will be a rapid high -speed train and the second, a high speed train.
The rapid high-speed trains will halt at specific stations whereas the high-speed train will have a single halt.
The permitted speed is 350 km/hr but the railways plans on operating the trains at 320 km/hr.
The fare structure of the bullet train will be 1.5 times
the first class AC fare of mail express trains.
According to senior railway officials, the fare of the high speed train will be higher than the Rajdhani and Duronto Express.
“It is too early to decide on the fare structure but they will definitely be higher than the first AC fares of mail express. Fare structures of Rajdhani and Duronto are also being considered,” said a railway board
official on condition of anonymity.

  
933 views
Aug 10 2017 (01:27)
Guest: 39090bf9   show all posts
Re# 2375636-1            Tags   Past Edits
ye apne wale hi delay krenge project

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Oct 3
Trains with ARP 15 Dep on: Sun Oct 8
Trains with ARP 30 Dep on: Mon Oct 23
Trains with ARP 120 Dep on: Sun Jan 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.