Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Nov 21, 2017 04:44:39 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Nov 21, 2017 04:44:39 IST

Blog Entry# 2377258
Posted: Aug 11 2017 (15:14)

1 Responses
Last Response: Aug 11 2017 (15:14)
  
Rail News
0 Followers
408 views
Other News
Aug 10 2017 (15:31)   Things to Know About 2-Year Mission Plan of Indian Railways

Jayashree ❖ Amita*^   38182 news posts
Entry# 2377258   News Entry# 311315         Tags   Past Edits
With a vision of a future with improved rail services and a better travel experience, the Ministry of Railways has released a 2-year Vision Document. It lists the long-term goals and milestones that the national transporter intends to achieve.
A 33-page document, the Indian Railways Visions and Plans 2017-2019 gives an insight into the ‘strategic road map’ that the Railways intends to undertake in the next two years.
The document discusses nine themes. Infrastructure Upgradation, Passenger Experience, Preferred Freight Carrier, Non-fare revenue enhancement, ‘Zero’ fatality, Modernization by digitization & cutting edge technology, Organizational
...
more...
culture, Cost focus and Sustainability.
These themes have been further subdivided into sub-themes, and each sub-theme has a strategic initiative identified under it. Further, each initiative has a set of action plans.
Here are some of the goals and objectives visualised by the Indian Railways, through which it aims to be the engine for India’s economic growth and development:
1. Introduction of high-speed trains (350kmph), from the current highest speed of 160kmph, along with the provision of a ultra high-speed wireless corridor along IR’s network.
2. Air cooled/temperature controlled services will be provided for long distance travel to all passengers in India.
3. Through the elimination of 6,113 Unmanned Level Crossings (UMLCs) on broad gauge lines, the Railways intends to improve the throughput on the existing network and turn into a high-speed one. That and an estimated reduction of 66 per cent in accidents.

4. Combining technology and passenger experience, an integrated app to provide all Railways affiliated services including ticketing, taxi etc. will be launched.
5. With a plan of setting up 2 lakh screens across 2,175 stations, they intend to build a dedicated platform for not only advertisements but also to generate passenger information.
6. Taking the environment-friendly route, the Ministry plans on solar and wind energy powered trains. Also, all production units, and at least one workshop in each zonal railway, is to be transformed into green industrial units.
7. In order to reduce electricity consumption, all the railway stations across the country will switch to LED usage.
8. Utilising the land marked for horticulture, IR has set a target of planting 5 crore trees under its sustainable development module.
9. They also plan on introducing rainwater harvesting systems on roofs of outsourced good sheds that are larger than 200sq m.
10. All coaches in the railways will be equipped with discharge-free bio toilets.

  
587 views
Aug 11 2017 (15:14)
a2z~   2186 blog posts
Re# 2377258-1            Tags   Past Edits
Report says- "Air cooled/temperature controlled services will be provided for long distance travel to all passengers in India."
Shall the air cooling/temperature control be provided to non ac coaches at same price or there is plan to increase fare, as per it has become customary to charge a premium of 15-30 % of base fare for the improved services. Else the pax. subsidy shall shoot up sharply as provision of such services shall entail one time investment in equipment in addition to recurring operation & maintenance costs..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 1
Trains with ARP 15 Dep on: Wed Dec 6
Trains with ARP 30 Dep on: Thu Dec 21
Trains with ARP 120 Dep on: Wed Mar 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.