Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Sep 23, 2017 04:09:40 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Sep 23, 2017 04:09:40 IST

Blog Entry# 2378702  
Posted: Aug 12 2017 (21:07)

1 Responses
Last Response: Aug 12 2017 (21:07)
  
Rail News
0 Followers
275 views
Commentary/Human InterestDMRC/Delhi Metro  -  
Aug 12 2017 (21:07)   NHAI to start work on project to decongest Dhaula Kuan – Airport Road Section of NH8

rdb*^   132538 news posts
Entry# 2378702   News Entry# 311555         Tags   Past Edits
Shri Nitin Gadkari to lay the foundation stone for the project on 14th August

Shri Nitin Gadkari, the Minister for Road Transport & Highways and Shipping will lay the foundation stone on 14th of August, for NHAI’s project to decongest one of Delhi’s most congested corridors which leads to Indira Gandhi International Airport. The first bottleneck is junction of station road with NH8 in front of Metro station. As per NHAI plan, this junction is being made signal free. To achieve this, a flyover is proposed to be constructed
...
more...
on right carriageway i.e. for traffic from Gurgaon to Delhi. At this junction, provision for U turn of traffic is also being provided. Further, two foot over bridges with escalators are also to be constructed for facilitating pedestrians. For segregating buses, proper bus bay is being provided. On station road a Vehicular Underpass is being constructed for facilitating smooth movement of Defence personnel.
The stretch from Dhaula Kuan Junction to Parade Road is proposed to be widened to ensure minimum four lanes on either side for through traffic. Near junctions additional structures are provided. In this stretch a Vehicular Underpass is also proposed to be constructed for connecting defence establishments on either side. It would also be connected with Manikshaw Centre.
At Parade Road Junction, the curve is being improved by road widening to allow smooth turning of traffic towards airport/ Gurgaon. At this junction, a Vehicular Underpass is being constructed for direct access to Parade Road. With this, the existing signals on these two junctions would be removed.
The project has already been sanctioned at a cost of Rs 260 crores. For undertaking this project, Ministry of Defence has agreed to transfer 13 acres of land to NHAI. For junction improvement, part of land is also required from police station. The bids for the project have been received and work is likely to start in October, 2017. The time period for completion of this work is 18 months.
To see the detailed design of the project please click on the link below :
Click here to see
******
NP/MS


(Release ID :169937)

  
1126 views
Aug 12 2017 (21:07)
rdb*^   31791 blog posts   388538 correct pred (81% accurate)
Re# 2378702-1            Tags   Past Edits

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Oct 3
Trains with ARP 15 Dep on: Sun Oct 8
Trains with ARP 30 Dep on: Mon Oct 23
Trains with ARP 120 Dep on: Sun Jan 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.