Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Nov 18, 2017 03:09:43 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Nov 18, 2017 03:09:43 IST

Blog Entry# 2380955
Posted: Aug 15 2017 (14:28)

11 Responses
Last Response: Aug 22 2017 (11:42)
  
General Travel
0 Followers
1948 views
Aug 15 2017 (14:28)   11301/Udyan Express

Jodhpur to Chennai Mumbai Bangalore HumSafar^~   87518 blog posts   5325 correct pred (78% accurate)
Entry# 2380955            Tags   Past Edits
Ye kab tak superfast hogi..
I hope this gets superfast status and LHB coaches soon.

6 posts - Wed Aug 16, 2017

  
1204 views
Aug 17 2017 (01:31)
fayazdm   273 blog posts
Re# 2380955-7            Tags   Past Edits
Introducing Bi or tri weekly of LHB Duronto cannot be done until and unless the entire Daund - Wadi gets doubled and electrified.Duronto runs max speed of 130kmph on double Electric line.on a single track like Bhigwan - solapur gulbarga many SF train's gets delayed due to crossings.and doubling and electrification of Entire Bhigwan Gulbarga will take at least max 3 years till then u can't expect Duronto between SBC/ YPR - CSTM .in case of YPR DEE Duronto it's a different case .The route was electrified from NDLS - SC ,so introduction of Duronto between NDLS - YPR was not a problem. The trains runs on MPS between SC - NDLS without delay.

  
1144 views
Aug 17 2017 (19:29)
LHB Coromandal A Dream^~   6814 blog posts   10007 correct pred (73% accurate)
Re# 2380955-8            Tags   Past Edits
Only doubling is not the constraint here.
Check out the stretch between Pune-Solapur-Wadi...The trains which are Superfast here, they generally have least counts of halts.
Like Siddheswar , Hutatma , PUNE SUR Intercity, DR MS SF , Latur SF, SUR YPR SF, Karnataka express etc.
Udyan have record number of halts here in this stretch just like CSTM MAS Mail and express.
...
more...

So Speed can be increased only by removing the halts (nearly 10-15 halts need to be removed) and full doubling through out.

  
1066 views
Aug 17 2017 (19:34)
LHB Coromandal A Dream^~   6814 blog posts   10007 correct pred (73% accurate)
Re# 2380955-9            Tags   Past Edits
yes .LHB is a must for this train...

  
1048 views
Aug 17 2017 (21:49)
★★★BRC WAP 7😎~   3331 blog posts   3164 correct pred (91% accurate)
Re# 2380955-10            Tags   Past Edits
with full doubling full electrification also required so that wap7's can cime in these route
and provide quick accelaration

  
1036 views
Aug 22 2017 (11:42)
fayazdm   273 blog posts
Re# 2380955-16            Tags   Past Edits
Doubling along with electrification is much important .Wap7 and wap5 can put out a good show here by hauling train's on time. Now that 12163 dadar Chennai egmore and chennai mail got change of traction two days back from Wadi - MAS , it helps to reduce the time atleast 15 - 20 minutes which is a bonus point.Now coming to the point i.e No.of haltings ,yes I believe it should be removed ,more no.of haltings also leads to delay in train's .stations which are unnecessary must be skipped. Now for udyan express LHB is highly impossible due to single line on Pune solapur Gulbarga.First completion of doubling is necessary on CR then can think of Humsafar duronto LHBfying etc.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Nov 28
Trains with ARP 15 Dep on: Sun Dec 3
Trains with ARP 30 Dep on: Mon Dec 18
Trains with ARP 120 Dep on: Sun Mar 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.