Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Tue Nov 21, 2017 02:51:34 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Tue Nov 21, 2017 02:51:34 IST

Blog Entry# 2381619
Posted: Aug 16 2017 (11:18)

1 Responses
Last Response: Aug 16 2017 (11:18)
  
Rail News
0 Followers
845 views
IR AffairsLMRC/Lucknow Metro  -  
Aug 16 2017 (11:04)   Lucknow Metro gets technical clearance

Twesh Rajput~   829 news posts
Entry# 2381619   News Entry# 311837         Tags   Past Edits
Lucknow Metro gets technical clearance
CMRS Satish Kumar Pandey gave his approval to the LMRC after inspecting a trial run of a Metro train at the maximum operating speed of 80 kmph. He, along with senior LMRC officials, carried out the inspection on Monday.
By: Express News Service
LMRC senior PRO Amit Kumar Srivastava said that the Government of India and the state government would
...
more...
be intimated that all clearances have been obtained to operate the metro rail in Lucknow.
In a major development for the commuters of Lucknow, Commissioner Metro Railway Safety (CMRS), Government of India, on Monday gave the green signal for the Lucknow Metro Rail Corporation (LMRC) to start commercial operations.
CMRS Satish Kumar Pandey gave his approval to the LMRC after inspecting a trial run of a Metro train at the maximum operating speed of 80 kmph. He, along with senior LMRC officials, carried out the inspection on Monday. The train completed a to-and-fro trial run between Transport Nagar Metro station and Charbagh Metro station. LMRC in a statement said that the trial run was completed successfully on the 8.5 km priority corridor which covers eight stations.
LMRC Managing Director Kumar Keshav said, “Getting all the required technical clearances from the Ministry of Railway and finally certification from the CMRS today to commence revenue operations on the Priority Corridor of the Lucknow Metro Project from Transport Nagar to Charbagh has been a great achievement. Now, doors are ready to be opened to commence public operation of the world class Metro service in Lucknow at any convenient date.”
LMRC senior PRO Amit Kumar Srivastava said that the Government of India and the state government would be intimated that all clearances have been obtained to operate the metro rail in Lucknow. Srivastava said a date will be sought from the government for inauguration.

  
1668 views
Aug 16 2017 (11:18)
suficardiodoc   42 blog posts   115 correct pred (60% accurate)
Re# 2381619-1            Tags   Past Edits
Great

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri Dec 1
Trains with ARP 15 Dep on: Wed Dec 6
Trains with ARP 30 Dep on: Thu Dec 21
Trains with ARP 120 Dep on: Wed Mar 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.