Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Mon Sep 25, 2017 09:52:28 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Sep 25, 2017 09:52:28 IST

Blog Entry# 2382275  
Posted: Aug 16 2017 (23:14)

12 Responses
Last Response: Sep 05 2017 (12:36)
  
★  General Travel
0 Followers
2404 views
Aug 16 2017 (23:14)   12913/Indore - Nagpur Trishatabdi Express | INDB/Indore Junction BG (6 PFs)

Kartik Varwade   20 blog posts
Entry# 2382275            Tags   Past Edits
This train needs an extension till Raipur/Bilaspur and also increase in its frequency. Raipur is not directly connected to Indore and many people of Indore travel by Amarkantak, Samata and Chattisgarh Exp. from Bhopal. Narmada Exp. runs between Indore and Bilaspur which is just a Fast Passenger in the name of an Express. 12913/14 and 12923/24 shall be merged together and should run as a single train via Ujjain in order to cater the people of the overall region

7 posts - Mon Aug 21, 2017

  
1378 views
Aug 22 2017 (09:29)
Shivam~   4725 blog posts   1173 correct pred (87% accurate)
Re# 2382275-8            Tags   Past Edits
Amarakntak runs with full occupancy, extension wouldn't benefit anybody

  
1252 views
Aug 23 2017 (15:12)
Kartik Varwade   20 blog posts
Re# 2382275-9            Tags   Past Edits
I have used my logic and based on that suggested the extension. Extending the INDB-NGP won't hamper much seat availability as it passes through Bhopal in midnight. I suggested it just for the benefit of Malwa region people. Else you can railways could extend it after gauge conversion of INDB-KNW-AK.
Extending 12854/53 Amarkantak to Indore will require another rake and it will reduce the quota for JBP pax as it is the only train connecting Jabalpur to Raipur/Durg region. This train nowadays runs with full occupancy from BPL till BSP.

  
1083 views
Aug 24 2017 (20:30)
abhinavp   1585 blog posts
Re# 2382275-10            Tags   Past Edits
I wonder why a new train can't be started...
Why this extension talk... As if IR has no coaches, engines...

  
543 views
Sep 05 2017 (12:32)
Kartik Varwade   20 blog posts
Re# 2382275-11            Tags   Past Edits
Starting a new train is a problem as there are very fewer ICF coaches in production. IR is fully engaged in the manufacture of LHB coaches and it has a long waiting for other zones to allot new coaches.
Even holiday specials these days are running with LHB coaches.
If we talk about engines, SECR does not have sufficient amount of locos, it usually borrows some locos from WCR and CR. Even its regular service, 18244/43 and 18246/45, does not have a regular link till date.
The
...
more...
extension could be done on a trial basis like it has been done in the past with 12442/41.

  
500 views
Sep 05 2017 (12:36)
Saurabh®~   3087 blog posts   43 correct pred (68% accurate)
Re# 2382275-12            Tags   Past Edits
ye sab fande SECR jaise garib aur kamjor zones ke liye hai jinki upar koi sunwai nahi hai. Yeha MOS railways sinha ji daily subah utha ke ek nayi train chala dete hai gazipur se wo bhi lhbfied.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Oct 5
Trains with ARP 15 Dep on: Tue Oct 10
Trains with ARP 30 Dep on: Wed Oct 25
Trains with ARP 120 Dep on: Tue Jan 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.