Blog Entry# 2382318  
Posted: Aug 17 2017 (00:52)

14 Responses
Last Response: Aug 17 2017 (19:42)
  
New Delhi, Aug 16: In order to make the rail journey more comfortable and remarkable, Indian Railways has been launching various services and projects. In this direction, Minister of Railways Shri Suresh Prabhakar Prabhu in a programme held today at Rail Bhawan, through video-conferencing launched and dedicated following services to the nation : -
1. Laying of foundation stone for Gaya Byepass (At Gaya, Bihar).
2. Dedication to the Nation- Electrification of Bakhtiarpur-Rajgir Section (at Bakhtiarpur, Bihar).
3.
...
more...
Dedication to the Nation- Electrification of Meralgram-Renukut Section (at Renukut, Jharkhand & UP).
4. Inauguration of following facilities at Bihta Station(Bihar): -
a) Extension of Platforms Nos. 1 & 2 for accommodation of 24 coaches, extension of Platforms shed-4 nos.
b) Provision of benches-12 nos.
c) Provision of water booth-1 no.
d) Improvement of circulating area (south side).
5. Inauguration/Dedication of following facilities at Chhapra(Bihar):
a) Dedication to the Nation - ISS at Chhapra station.
b) Inauguration of works of escalators (02 nos) and
improvements to platforms of Chhapra station.
c) Laying of foundation stone for second entry gate of Chhapra station.
d) Inauguration of Water Vending Machines (02 nos.) at Chhapra.
e) Dedication to the Nation-Wi-fi at Chhapra station.
6. Dedication to the Nation-newly constructed Goods Sheds
and 6 lines station at Chhapra Gramin Station.
7. Dedication to the Nation - Green Corridor in Bhagalpur- Banka section (Bihar) of Malda Division.
Minister of State for Railways Shri Rajen Gohain was specially present to grace the occasion. Chairman, Railway Board, Shri A. K. Mital, other Railway Board Members, several other dignitaries and senior officials were among those present on the occasion.
Speaking on the occasion, Minister of Railways Shri Suresh Prabhakar Prabhu said that the unfortunate floods in Bihar & Assam has caused distress. Indian Railways is extending all possible help to the victims. Inaugurations of various passenger amenities in different parts of Bihar will help the people of Bihar for comfortable journey experience.
SERVICES LAUNCHED : -
1) Laying of Foundation Stone for Gaya Bypass
Benefits:
● Provides Direct Connectivity from 3rd Line between Gaya & Manpur(for movement to Kiul) to Gaya Patna Line.
● Avoids Reversal at Gaya Station and will improve the movement of COAL,STEEL,CEMENT & FOOD GRAINS to Patna.
2) Electrification of Bakhtiarpur-Rajgir
Benefits
•Manpur - Tilaiya - Bakhtiyarpur is a missing link between two electrified corridors of Mughalsarai - Patna - Bakhtiyarpur -Sitarampur - Howrah (Delhi-Howrah main line) and Mughalsarai-Gaya-Dhanbad-Sitarampur-Howrah (Grand Chord).
•The proposed section is a shorter route for transportation of coal to National Thermal Power Corporation's Barh thermal power plant.
•Coal will be fed through this route from Tori-Shivpuri collieries of Central Collieries.
•Apart from Coal, this section also carries Fertilizers, Food Grains, Cement , Salt etc.
'•After electrification of entire section, there will be seamless flow of electric trains in this section as traction changes/detentions at Manpur and Bakhtiyarpur ends would be eliminated.
3) Electrification of Meralgram-Renukut section.
Benefits:
● Garwa Road-Chopan-Singrauli including Karaila Road-Shaktinagar single line section of East Central Railway covering 257 route kilometers passes through the states of Jharkhand and Uttar Pradesh.
● Electrification of Garwa Road-Chopan-Singrauli with a view to ultimately connect Eastern and Central parts of India seamlessly through Garwa Road - Chopan - Singrauli - Katni- Bina - Kota.
● The electrification of the mentioned route of ECR is necessary from strategic perspective for increase in traffic, operational flexibility and better utilization of assets in electrified section.
● Electrification of this route will also avoid traction change at Garwa Road.
4) Inauguration of Passenger Amenities at Bihta Station
● Extension of PF Sheds (4 Nos.).
● Benches (12 Nos.), Water Booth (1 No.).
● Improvement of Circulating Area (South Side).
● Extension of PF Nos. 1 & 2 for accommodation of 24 coaches.
5) Inauguration of Passenger amenities at Chhapra Station
● Foundation stone for second entry gate- Estimated cost for Second Entry Gate is Rs. 24.62 Crores.
● Wi Fi Facility at Chhapra Station- The facility for the visitors & rail users of Chhapra Railway Station is being provided by RailTel in partnership with Google with no cost to Railway for providing high speed state of the art world class internet experience to the commuters. The Railwire wi-fi service is currently available at 127 stations.
● The facility will offer high-speed broadband like experience to users Wi-Fi facility is being provided at A1 & A category Railway station.
● Provision of escalators and modification of platforms at Chhapra station.
● Chhapra station is an 'A-1' category station on Gorakhpur cantt. and Chhapra Katcheri section of Varanasi Division, NER.
● The estimated cost of provision of escalators at Chhapra station is Rs. 7277052/- each escalator (total Rs.7277052X2= Rs. 14554104/-).
6) Inauguration of New Goods Shed at Chhapra Gramin Station
● Chhapra Gramin is a crossing station having 6 running lines. 2 lines are electrified and rest are in progress.
● New goods shed opened from Feb. 16.
● Mainly I/W traffic of cement, fertilizer and food grain. Average 23 rakes per month.
● Good sheds has one full rake replacement capacity, pucca platform, adequate light arrangement and round the clock working.

9 posts - Thu Aug 17, 2017

  
870 views
Aug 17 2017 (13:05)
BJ~   2437 blog posts
Re# 2382318-10            Tags   Past Edits
haa Muri JSJ ki refuelling to chopan mein hi hoti hai..

  
705 views
Aug 17 2017 (19:18)
BJ~   2437 blog posts
Re# 2382318-11            Tags   Past Edits
upto SGRL, I donot think CRS will be happning by March 2018.. Progress is very slow.

  
699 views
Aug 17 2017 (19:20)
सिंगरौली aka ऊर्जांचल*^~   5709 blog posts   9701 correct pred (74% accurate)
Re# 2382318-12            Tags   Past Edits
still 6 months . lets see when it will be done

  
696 views
Aug 17 2017 (19:22)
BJ~   2437 blog posts
Re# 2382318-13            Tags   Past Edits
any idea about traction substation work at chopan and SGRL? and the transmission line which was proposed to feed these substation?

  
684 views
Aug 17 2017 (19:42)
सिंगरौली aka ऊर्जांचल*^~   5709 blog posts   9701 correct pred (74% accurate)
Re# 2382318-14            Tags   Past Edits
Maybe obra dam par bane TSS , i guess NTPC Nabinagar ( jointly with IR ) will supply . 1000 mw powerplant with 2x250 Commissioned , Rest will be commissioned by 2018 end .
There are 2 powerplants under const. 1 at nabinagar combined capacity of 1980+1980+1000 ~ 5000MW
A . 3x660 = 1980 ntpc+bihar govt ( to be added 3x660 mw later )
B
...
more...
. 4X250 = 1000 ntpc+railways

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Sep 30
Trains with ARP 15 Dep on: Thu Oct 5
Trains with ARP 30 Dep on: Fri Oct 20
Trains with ARP 120 Dep on: Thu Jan 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2409730
    Sep 15 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment" have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are an integral...
  • Entry# 2390218
    Aug 25 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
  • Entry# 2165159
    Feb 15 2017 (09:53AM)


    A minor update, but may impact many members: Hereafter, FMs will be able to delete invalid Red Flags on Imaginary trains. Red Flags can be removed by FMs, only against specific complaints filed against the blog. This does not give all members the right to complain against EVERY single red flag they...
  • Entry# 2155798
    Feb 08 2017 (11:40AM)


    -@all members: As of recently, there has been a trend whereby minor name updates of Trains/Stations - whether such and such regional name should be there or not, whether the train should be called "Abc Express" or "Abc Superfast Express", etc. are threatening to take over the majority of Timeline entries. Also,...
  • Entry# 2147631
    Feb 01 2017 (11:05AM)


    A new experimental feature is being introduced called BotD - "Blog of the Day". The rules are: . 1. Replies are not eligible - only the Top Blog. 2. ONLY Blogs posted today (the day of the vote) are eligible. 3. Every member has ONE vote. In the course of the day, you may keep...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.