Any news if there is an additional bridge connecting SRR-Ers stretch? As of now this is a single line and trains have to wait at the outer before the bridge.e
Quite strange that SR has unable to solve this bottleneck !!! Jut after SRR and just before the bridge, one can see some construction and laying of track....