Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Apr 25, 2018 14:53:26 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 2631146
Posted: Nov 05 2017 (18:45)

10 Responses
Last Response: Nov 05 2017 (19:58)
  
source:- click here
northern railway scripts a new narrative in construction engineering with the launch of main arch of iconic chenab bridge under construction on the katra-banihal rail section today
launch of the main arch includes world’s longest cable crane arrangment with heavy segments launched from two ends of the bridge viz. kauri end and bakkal end
the indian railways created a red letter
...
more...
day today by commencing the launch of the main arch of the bridge today on the iconic bridge being constructed on river chenab on katra- banihal section as part of the flagship udhampur-srinagar-baramulla rail link (usbrl) project. the launch of the main arch commenced this morning after a ceremonial program under the aegis of shri mk gupta, member engineering, railway board, shri ak sachan chief administrative officer, usbrl at the chenab construction site. the launch of the main arch features as a noteworthy endeavor as it entails carrying heavy segments from the two ends of the bridge viz. kauri end and bakkal end and includes categorically the world longest cable crane arrangement. senior officers of krcl and northern railway along with construction partners were present on this historic occasion.
it may be interesting to note that the chenab bridge on katra- banihal section of usbrl project is the world's highest railway arch bridge at 359 m height. world renowned national & international consultants have been engaged during various stages of project. detailed geo-physical studies, seismic studies, slope stability studies have been included. the bridge shall be about 5 times higher than renowned qutub minar and about 35 m higher than eiffel tower. first time on the globe, bridge has been designed for blast load in consultation with drdo. the erection of the bridge is a project in itself. to achieve these pylons were erected on either side of the river, and two auxiliary self-propelled cable cranes were used to tow temporary auxiliary ropes across these pylons. the ropes were used to support the partly finished arch parts. both the embankments of chenab facing downstream have hard cherty dolomite & quartzite forming steep cliffs. the launching is typically performed in a series of increments so that additional sections can be added to the rear of the superstructure unit prior to subsequent launches.
the bridge is envisaged to create its own benchmarks in construction engineering and unparalleled records.
three massive workshops for undertaking fabrication of steel structure has been commissioned at srinagar end of bridge and one at katra end of the bridge. for launching purpose, arrangements in the form of pylons with cable cranes spanning the entire gorge have been completed successfully. the cable crane assembly including pylons at span of 915 meters is the longest in the world . for the first time on indian railways viaduct was launched on curve of 2.74 degree.
the details of the chenab bridge including different stages of execution and scope of the remaining works is enclosed as an attachment.

5 posts - Sun Nov 05, 2017

  
321 views
Nov 05 2017 (19:17)
Break from active IRI^~   3215 blog posts   5656 correct pred (77% accurate)
Re# 2631146-6            Tags   Past Edits
start me sufficient number me DEMU/fast passenger (6-8 from both sides) and some new express between Jammu and Banihal should be start...
and ek station big junction ki form me develop karna cahahiye

  
332 views
Nov 05 2017 (19:19)
Guest: 7fe136dd   show all posts
Re# 2631146-7            Tags   Past Edits
srinagar ko hi karna chahiye ya baramula ko aur i wish k in future leh ladakh tak bhi rail connectivity ho jaye

  
323 views
Nov 05 2017 (19:19)
Break from active IRI^~   3215 blog posts   5656 correct pred (77% accurate)
Re# 2631146-8            Tags   Past Edits
uttar sampark kranti and jammu mail...
rajdhani ke chakkar me sari trains khadi rahengi kahi kahi

  
308 views
Nov 05 2017 (19:23)
Break from active IRI^~   3215 blog posts   5656 correct pred (77% accurate)
Re# 2631146-9            Tags   Past Edits
ha but jagah dekhkar kisi dusri jagah bhi bna sakte h, jaha bahut jyada plain available ho

  
287 views
Nov 05 2017 (19:58)
😍19027 बांद्रा टी जम्मू तवी विवेक Exp😍~   15249 blog posts   873 correct pred (65% accurate)
Re# 2631146-10            Tags   Past Edits
Superb Pics Bhai.. Thanks for providing us this this route info..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat May 5
Trains with ARP 15 Dep on: Thu May 10
Trains with ARP 30 Dep on: Fri May 25
Trains with ARP 120 Dep on: Thu Aug 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.