Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sun Nov 18 13:44:43 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 2637283
Posted: Nov 07 2017 (09:21)

2 Responses
Last Response: Nov 07 2017 (09:25)
  
Rail News
0 Followers
292 views
New Facilities/Technology
CR/Central
Nov 07 2017 (09:20)   Bhusawal stn to get escalators, elevators

BPQ NGP Shuttle~   6 news posts
Entry# 2637283   News Entry# 321974         Tags   Past Edits
The Bhusawal railway station will soon have two escalators and an equal number of elevators catering to passengers travelling across eight platforms.
Bhusawal junction connects train traffic coming from Nagpur, Khandwa and Mumbai and has eight platforms to help passengers cross over between trains heading for their respective destinations.
Bhusawal divisional railway manager SK Gupta said the railway station would soon get two escalators and two lifts to serve passenger movement. "There was a high demand from passengers seeking arrangement that could help them scale the foot over-bridge to cross from platform to
...
more...
the other," Gupta said.
The construction of escalators and lifts is part of the Railway Board decision to arm the big stations and junctions with the facility for easier movement of the passengers.
The existing foot over-bridge that lies at the centre of the platforms will have escalators while the FOB under construction (towards Nashik-end) will be equipped with elevators.
The escalators and the elevators will be raised on full length joint platform numbers 1 and 3 and platform numbers 4 and 6.
The platform numbers 2 and 5 are small ones that occupy only a section of these joint platforms and act as termination points for the trains coming from Mumbai and Nagpur directions, respectively. The passengers from these platforms will ultimately use the facilities on joint platforms.
The luminaries at Bhusawal railways station will also be replaced by light emitting diodes (LED) fittings instead of regular fluorescent or compact fluorescent lamps (CFL).
The officer also informed that the mainline electrical multiple unit (MEMU) rakes stationed at Bhusawal is likely to be put to use in a month's time. The MEMU has only one driver and does not have an assistant driver. To operate the train the driver has to be given training to the effect. Besides, the running of MEMU is also waiting the clearance from the safety commissioner.
"Once the safety commissioner approves it, the MEMU is likely to operate between Nashik and Bhusawal. It could take a month's time," Gupta said.

2 Public Posts - Tue Nov 07, 2017

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Nov 28
Trains with ARP 15 Dep on: Mon Dec 3
Trains with ARP 30 Dep on: Tue Dec 18
Trains with ARP 120 Dep on: Mon Mar 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4003283
    Nov 14 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 2018 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy