Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sun Dec 17, 2017 02:31:22 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sun Dec 17, 2017 02:31:22 IST

Blog Entry# 2774018
Posted: Nov 16 2017 (08:35)

8 Responses
Last Response: Nov 17 2017 (23:31)
  
General Travel
0 Followers
932 views
Nov 16 2017 (08:35)   SIKR/Sikar Junction (3 PFs)

divyanshusharmalove   73 blog posts
Entry# 2774018            Tags   Past Edits
Abi sikar me pt 1 ko toda ja rha h, fir ise nya bnaya jayega, or abi track ka kam b pura ni ho paya h, washing line pr track dalna baki h, ye sb hone ke bad crs hoga, crs hone ke bad koi train ki umid ki ja skti h,

3 posts - Thu Nov 16, 2017

  
608 views
Nov 17 2017 (11:53)
SGNRSIKAR and SGNRBKN ICE must   166 blog posts
Re# 2774018-4            Tags   Past Edits
I remember that gauge conversion of entire SGNR-SOG route of 138 Km was completed in 1 and half years. In December 2010 the block was taken and first train started operation in July 2012. Now the conditions have worsened so much that the work has not been completed on a meagre 50 Km stretch in more than 2 years. Its really a pity situation for the public.

  
593 views
Nov 17 2017 (11:54)
उत्तर पश्चिम रेलवे NWR^~   17123 blog posts   495 correct pred (58% accurate)
Re# 2774018-5            Tags   Past Edits
PF2 ka kaam kitna baaki hai ?

  
558 views
Nov 17 2017 (13:03)
divyanshusharmalove   73 blog posts
Re# 2774018-6            Tags   Past Edits
pt 2 complete h, Crs ni hua bsss, crs pt1&2, washing line ka sath hi krenge

  
518 views
Nov 17 2017 (14:13)
उत्तर पश्चिम रेलवे NWR^~   17123 blog posts   495 correct pred (58% accurate)
Re# 2774018-7            Tags   Past Edits
Tab to time jayada lagega.

  
409 views
Nov 17 2017 (23:31)
narendrasharma~   360 blog posts
Re# 2774018-8            Tags   Past Edits
ab samajh lo sab kuchh baki hi rahega. main kaam ka percentage sabhi ne baant liya h baki gaya bhad men

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed Dec 27
Trains with ARP 15 Dep on: Mon Jan 1
Trains with ARP 30 Dep on: Tue Jan 16
Trains with ARP 120 Dep on: Mon Apr 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.