Rail News
0 Followers
325 views
CR/Central  -  
Nov 16 2017 (21:50)   Doubling of Kalamna-Ngp rail line to boost train operations

🚂🚃🚃आपको हुई असुविधा के लिए हमें खेद है🚋🚋   141 news posts
Entry# 2779748   News Entry# 322780         Tags   Past Edits
NAGPUR: On Thursday, the Nagpur railway station is set to achieve a milestone in passenger and freight train operations with the commissioning of long-stalled doubling of Kalamna-Nagpur railway line.
The Rs 21-crore doubling project was announced in the 2007-08 Railway Budget to ease congestion on Howrah-Mumbai route. In nine years, the project cost escalated to Rs 37 crore as encroachments in between delayed the project.
Railway officials termed doubling as the biggest project to streamline train operations. They said if at all a major development in operations would come in future, it would
...
more...
be the third line between Nagpur and Wardha.
They said daily 85-90 passenger and freight trains ply between Nagpur and Kalamna over two available single lines — one connecting Kalamna and Nagpur and another Itwari. The new line will augment section capacity by about 30%, thereby easing congestion, especially in Kalamna and Nagpur sections.
"Operating so many trains on a single twin line was a Herculean task. Now, congestion will be eased by over 50% and trains' handling capacity will go up by one-third," officials told TOI.
The South East Central Railway (SECR), Nagpur, has completed non-interlocking (NI) work last month and is awaiting clearance from commissioner railway safety (CRS). The crucial Rs 37-crore project will be inspected by CRS (Eastern Circle) PK Acharya on November 17 morning, with a speed trial at 110 kmph. He will also do trolley inspection of the new track.
The double line gives edge to both Central Railway and SECR. Earlier, being a single line section, only one train could be permitted between Kalamna and Nagpur. Now, two trains could be permitted.
"Passengers will not have to wait at the outer for long for want of path and vacant platform at Nagpur station. The doubling will not only ease congestion but curb detention of trains," said Central Railway divisional railway manager (DRM) Brijesh Kumar Gupta.
Gupta said doubling has paved way for utilizing platform number 8 (home platform) fully by admitting trains on the east side. This will also create space for other trains at platform numbers 3, 4, 5 & 6. Currently, home platform is used by Nagpur-Mumbai Duronto only.
Even SECR DRM Amit Kumar Agarwal said that owing to less rains, hydropower generation is down and there has been 20% rise in coal transportation on SECR routes.
"With doubling, we stand to gain as there will be a dedicated line for freight train movement. It will also improve train punctuality on east-west route. In future, Nagpur can get more trains," Agarwal said.
"At Itwari station, we are constructing two pit lines where trains can be maintained. Hence, doubling is a win-win situation," the DRM said.
Agarwal said it was an arduous task taking blocks and completing OHE, signalling, yard remodelling at Kalamna, and laying of tracks in record time

  
950 views
Nov 17 2017 (13:48)
a2z~   2227 blog posts
Re# 2779748-1            Tags   Past Edits
Good News. Small doubling project wwith big implication on the train operation (SECR) to/thru NGP
0

  
951 views
Nov 17 2017 (13:50)
12649⭐️ KSK ⭐️12650^~   14761 blog posts   4192 correct pred (68% accurate)
Re# 2779748-2            Tags   Past Edits
Presently only SECR trains use Nagpur-Itwari-Kalamna route?

  
921 views
Nov 17 2017 (13:57)
akku~   952 blog posts   633 correct pred (82% accurate)
Re# 2779748-3            Tags   Past Edits
Hopefully now they can reduce the slack time, normal SF can do bsp-ngp in 5:30 hrs instead of currently 6hrs.durunto can be speeded by 10 min

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Dec 28
Trains with ARP 15 Dep on: Tue Jan 2
Trains with ARP 30 Dep on: Wed Jan 17
Trains with ARP 120 Dep on: Tue Apr 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.