Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Fri Dec 15, 2017 18:02:11 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Dec 15, 2017 18:02:11 IST

Blog Entry# 2794175
Posted: Nov 20 2017 (21:11)

1 Responses
Last Response: Nov 20 2017 (21:11)
  
Rail News
0 Followers
175 views
Commentary/Human InterestSR/Southern  -  
Nov 20 2017 (12:19)   Late running of trains to continue

imaravIndian^~   151 news posts
Entry# 2794175   News Entry# 322951         Tags   Past Edits
Trend attributed to tardy pace of replacing 110-km track in Thiruvananthapuram Division
Delayed arrival of trains in the Thiruvananthapuram Division of the Indian Railways is set to continue till 2019, thanks to tardy pace of replacing 110 km of track, according to senior railway officials.
At present, approximately 70% of trains in the division arrive late at stations, causing unrest among commuters. (This means passengers will have to put up with late arrival for another two years.)
Up
...
more...
to 35% of trains get delayed by 15 minutes or more. This in turn impacts trains that follow, affecting regular commuters, office-goers, women, aged people, and candidates appearing for tests and interviews.
Thiruvananthapuram Divisional Railway Manager Prakash Bhutani said the division had obtained sanction to replace 140 km of ageing tracks.
“Only 30-km track has been replaced, while rails have arrived for another 10 km. The whole process will take up to two years, and passengers will have to bear with us for late / slow running of trains. All trains will operate according to the timetable from then on,” he added.
During his recent visit to Kerala, the Chairman of the Railway Board had reiterated that safety had to be accorded priority, even if trains had to run late. “The late running of trains has been accentuated by the fact that 150 temporary halts were sanctioned for passenger trains between 2014 and 2016. The halts are still in place even now. A train slowing down to halt at a station and then picking up speed takes up to 10 minutes. A slow-running train further slows down those that follow,” Mr. Bhutani said.
Two-hour blocks
Now, trains are blocked for up to two hours at sites where tracks are being replaced. This leads to piling up of trains and the subsequent cascading effect wherein all trains running on the route suffer delay. Using this manual method, less than 300 metres of tracks can be replaced in two hours as sleepers are inserted manually. Up to 3 km of tracks can be replaced using machines, provided the track is blocked continuously for six hours. But it will require cancellation of many trains.
Slow doubling
The availability of double tracks in Kottayam and Alappuzha may help in avoiding delay in services. However, doubling is pending on four stretches in Kottayam. In Alappuzha, doubling work is in progress on two stretches, with the result that only a single track is available in the rest of the district.

  
1189 views
Nov 20 2017 (21:11)
srinivasvasanthi~   4177 blog posts   15 correct pred (54% accurate)
Re# 2794175-1            Tags   Past Edits
In this Digital era ,2 months time are sufficient to find an amicable solution for late running of trains in the Thiruvananthapuram division.
2 year period is too much in this Digital era.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Dec 25
Trains with ARP 15 Dep on: Sat Dec 30
Trains with ARP 30 Dep on: Sun Jan 14
Trains with ARP 120 Dep on: Sat Apr 14

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.