Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

For RailFans, seeing RAC-1/2/3 in Mumbai-UP Trains is more exciting than Election Results - rdb

Full Site Search
  Full Site Search  
 
Fri Feb 21 06:40:32 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Stream
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 2794175
Posted: Nov 20 2017 (21:11)

1 Responses
Last Response: Nov 20 2017 (21:11)
  
Rail News
0 Followers
2112 views
Commentary/Human Interest
SR/Southern
Nov 20 2017 (12:19)   Late running of trains to continue

puᴉʌɐɹ∀^~   166 news posts
Entry# 2794175   News Entry# 322951         Tags   Past Edits
Trend attributed to tardy pace of replacing 110-km track in Thiruvananthapuram Division
Delayed arrival of trains in the Thiruvananthapuram Division of the Indian Railways is set to continue till 2019, thanks to tardy pace of replacing 110 km of track, according to senior railway officials.
At present, approximately 70% of trains in the division arrive late at stations, causing unrest among commuters. (This means passengers will have to put up with late arrival for another two years.)
Up
...
more...
to 35% of trains get delayed by 15 minutes or more. This in turn impacts trains that follow, affecting regular commuters, office-goers, women, aged people, and candidates appearing for tests and interviews.
Thiruvananthapuram Divisional Railway Manager Prakash Bhutani said the division had obtained sanction to replace 140 km of ageing tracks.
“Only 30-km track has been replaced, while rails have arrived for another 10 km. The whole process will take up to two years, and passengers will have to bear with us for late / slow running of trains. All trains will operate according to the timetable from then on,” he added.
During his recent visit to Kerala, the Chairman of the Railway Board had reiterated that safety had to be accorded priority, even if trains had to run late. “The late running of trains has been accentuated by the fact that 150 temporary halts were sanctioned for passenger trains between 2014 and 2016. The halts are still in place even now. A train slowing down to halt at a station and then picking up speed takes up to 10 minutes. A slow-running train further slows down those that follow,” Mr. Bhutani said.
Two-hour blocks
Now, trains are blocked for up to two hours at sites where tracks are being replaced. This leads to piling up of trains and the subsequent cascading effect wherein all trains running on the route suffer delay. Using this manual method, less than 300 metres of tracks can be replaced in two hours as sleepers are inserted manually. Up to 3 km of tracks can be replaced using machines, provided the track is blocked continuously for six hours. But it will require cancellation of many trains.
Slow doubling
The availability of double tracks in Kottayam and Alappuzha may help in avoiding delay in services. However, doubling is pending on four stretches in Kottayam. In Alappuzha, doubling work is in progress on two stretches, with the result that only a single track is available in the rest of the district.

1 Public Posts - Mon Nov 20, 2017

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Mar 2
Trains with ARP 15 Dep on: Sat Mar 7
Trains with ARP 30 Dep on: Sun Mar 22
Trains with ARP 120 Dep on: Sat Jun 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy