Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Sat Dec 16, 2017 11:08:47 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Sat Dec 16, 2017 11:08:47 IST

Blog Entry# 2797178
Posted: Nov 21 2017 (21:39)

1 Responses
Last Response: Nov 21 2017 (21:43)
  
दक्षिण पश्चिम रेलवे/SOUTH WESTERN RAILWAY
BENGALURU-MYSURU DOUBLE LINE (138.3 KM) COMMISSIONED FOR TRAFFIC
The pending 1.7 KM stretch of doubling between Bengaluru-Mysuru line at Srirangapatna has been commissioned for traffic today. With commissioning and completion of this stretch of 1.7 Km. at Sriranagapatna, the entire Bengaluru-Mysuru (138.3 km) Doubling Project now stands fully completed and commissioned (excluding electrification between Yeliyur-Mysuru (39 Km), which is also nearing completion) which will reduce the travelling time between Bengaluru and Mysuru.
...
more...
The doubling of Bengaluru- Mysuru was sanctioned in 3 stages.
Stage-I: (Bengaluru-Kengeri – 12.3 Km) was completed & commissioned in Feburary, 2007 at a cost of Rs. 39.59 Crore.
Stage-II: (Kengeri-Ramanagaram – 32.00 km) was completed and commissioned in October, 2008 at a cost of Rs. 75.98 Crore.
Stage-III: Ramanagaram-Mysuru Doubling with Electrification from Kengeri to Mysuru at an anticipated cost of Rs.875 Crore. was taken up on cost sharing basis with Government of Karnataka. Doubling in Ramanagaram-Mysuru (94.00 km) was completed and commissioned in October, 2015 except for a small stretch of 1.7 km at Srirangapatna.
This 1.7 Km stretch at Srirangapatna was having Tippu Sultan’s Armoury, an Archeological protected structure (monument). As this historic structure was exactly in the Doubling alignment, it was required to be translocated to a new location. The shifting of Tippu’s Armoury to the new location, a unique work done for the first time in India, was completed in March 2017 with help of M/s. Wolfe House Building Movers, USA, a pioneer in this field.
In addition three Cauvery tributaries namely Cauvery North, Cauvery South & Paschimavahini were all located at the approaches of Sriranagapatna Station. New bridges were constructed across these three rivers for accommodating 2 new tracks.
After completion of shifting of Tippu’s Armoury to a new location, the earthwork, platform work and track linking works at this stretch of 1.7 Km. was taken up and completed in the month of Sept., 2017 along with the balance work of three bridges. After statutory inspection by Commissioner of Railway Safety on 06.11.2017, followed by authorization to introduce the passenger trains services on this newly laid track, this stretch was also commissioned for traffic on 21.11.2017. ..
SOURCE : SWR

  
746 views
Nov 21 2017 (21:43)
⭐अवंतिका एक्सप्रेस⭐^~   4476 blog posts   4232 correct pred (92% accurate)
Re# 2797178-1            Tags   Past Edits
CONGRATULATIONS to all the RF of SWR and other South zone.. for this long waiting project of SWR got completed today with traffic commission on new track..
with this only finally SBC MYS is double line ..
after few days again good news will come from SWR for completing electrification and making SBC MYS route as FEDL...
waiting for that day when
...
more...
WAP 7 locomotives hit's the boundary of MYSORE..

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue Dec 26
Trains with ARP 15 Dep on: Sun Dec 31
Trains with ARP 30 Dep on: Mon Jan 15
Trains with ARP 120 Dep on: Sun Apr 15

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.