Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Fri Oct 19 14:01:55 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 2953197
Posted: Dec 30 2017 (13:44)

6 Responses
Last Response: Dec 30 2017 (19:26)
  
Travelogue
1 Followers
8510 views
★★★
Dec 30 2017 (13:44)   12083/Mayiladuturai - Coimbatore Jan Shatabdi Express | TPJ/Tiruchchirappalli Junction (8 PFs)

Cheap Thrills^~   6636 blog posts   28609 correct pred (76% accurate)
Entry# 2953197            Tags   Past Edits
Trip to MDU from TJ via TPJ.
Kindly take time and go through friends...
Point wise not picture wise...
1.Booked in 12083 Janshatabdi and 12635 Vaigai SF Combo.
2.JS came to TJ by 15.58 and
...
more...
left by 16.00 with TNP WDM.3A 16297. My D6 coach contained all intermediate travellers like me.
3.Noticed Doubling works till SGM. ALK atm PF 3 works are in full swing but the earlier construction of this station turned difficult to do so and joining of tracks.
Tracks came till TJ outer but still not into station.
BAL TO TPJ doubling works completed.
4.Just ripped past ALK and THUNDERED BAL and TRB.
5.Slowed down at SGM for track change crawled and sped up.
6.MPS of SGM TPJ New line is 95KMPH.
7.Slowed down at GOC , Crossed TPJ KIK DEMU and trolled at TPJ outer for 5 minutes. Then Arrived TPJ at 17.00 PF 1. It did undergo loco change and not the same loco reversed, some ED WDM 3X accompanied it aftermath. Completed the process within 10 minutes.
8.TPJ KRR Pass was linked with ED WDM 3D 11108 on PF 1
9.Within 5-10 minutes of departure of 12083, 16861 arrived TPJ at PF 6 with a surprise offlink ED WDG 3A 1349X. Once MNM TPJ MQ arrived at PF 5 with full rajdhani liveried rake, 16861 chugged out from TPJ with its tiny rake and by 17.30 for on time TPJ MQ Pass left.
10.Then later by 17.45 56711 came into TPJ 15 minutes late with GOC WDG 3A 147XX transferred from other DLS and cream and red liveried. Later the same bogie was handed over to ED WAP 4 2278X.
11.TPJ KKDI DEMU was parked in PF 1 and left at 18.15. From this I understood that Vaigai is late.The shocking thing was Himsagar slip was expected on 19.45 at TPJ against its scheduled time 11.50.
12.Then Vaigai Came with RPM WAP 7 30342 at 19.15 at PF 1 and left at 19.20. I cud see some KL passengers boarding this and many people used it for TPJ MDU. It is better that MDU PUU pass 56700/1 is extended to TPJ.
13.Had a very good run by Vaigai.The track towards MDU in MPA had some TSR of 20 for which it was trolled then picked up speed.Crossed 22628 at KLS.
14.Regarding KFC TMP doubling it is complete in certain stretch except the mini ghat section enroute. No sign of tracks there. Slowed at TMP and entered DG at PF 4. Immediately after we enter, 16780 left DG from PF 3 with some GOC WDG 3A. You can see the last pic.
15. Thundered thereafter, Crossed 12638 Pandian after KQN Scissor crossing, also crossed 16235 at ABI with some ED alco.Hardly chugging TNP alco powered 22624 Mahal SF crossed us in KON.
16.Reached MDU by 21.40 at PF 3. 56700 was parked in PF 4 and 16339 expected at PF 2. And 12662 came to MDU with ED WDM 3A couples...💑
17. Kindly tolerate my low quality picture. Was taken with Nokia 150.
THANK YOU....

6 Public Posts - Sat Dec 30, 2017

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Oct 29
Trains with ARP 15 Dep on: Sat Nov 3
Trains with ARP 30 Dep on: Sun Nov 18
Trains with ARP 120 Dep on: Sat Feb 16

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 2018 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
  • Entry# 3535285
    Jun 15 2018 (08:28PM)


    This is a clarification to all members regarding our Forum Guidelines and the FM Group. SWs are issued for very clear cases of abuse and misbehaviour by a member. . At this time, we have had many members against whom SW is issued claim that: "I am a long-time member of IRI, and have...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy