Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Bookmark
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Dec 12 02:39:47 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 2955059
Posted: Dec 30 2017 (22:38)

2 Responses
Last Response: Dec 31 2017 (08:11)
  
Rail News
0 Followers
768 views
New Facilities/Technology
KM/Kolkata Metro
Dec 30 2017 (16:53)   1st rake only in March, cloud over EW Metro June launch | Kolkata News - Times of India

বিদায় আইআরআই^~   528 news posts
Entry# 2955059   News Entry# 325768         Tags   Past Edits
Kolkata: Rakes for the East-West Metro corridor will not arrive any time soon.
BEML Ltd, which won the Rs 899-crore contract from the Kolkata Metro Rail Corporation Ltd (KMRCL) to supply 14 rakes for the East West service, has said it can deliver the first rake only in March 2018, five months behind schedule.
The delay in delivery has cast a cloud on the June 2018 launch of the East West Metro's first phase between Salt Lake Sector V and Phoolbagan. To maintain a frequency of 6 minutes on the 7.07km stretch, a
...
more...
minimum of five rakes are required. KMRCL officials hope the rakes will be delivered in double quick time, but admit that the delay has left little room for manoeuvre.
BEML was originally scheduled to deliver the first rake in October 2017. But the delivery date was pushed back due to delay in supply of a vital component that KMRCL has to procure from Europe. The fresh delivery schedules were drawn up at a meeting at KMRCL headquarters on December 15.
"The delay is due to certain supply delays from affiliated contractors and not due to any problem at BEML's end," said AGM (corporate communications) Ramananda S.
When KMRCL had awarded the contract to BEML in February 2016, the letter of intent (LOI) specified a delivery schedule of 128 weeks, or till July 2019. Later, considering the traffic congestion in Kolkata, BEML and KMRCL mutually agreed to reduce the schedule to 85 weeks. This effectively meant the first rakes were to be ready by the end of 2017. However, a special cable that KMRCL is procuring from France is yet to be delivered to BEML. The cable has to pass through each coach to set up the communications-based train control (CBTC) that will enable telecommunications between the train and track equipment.
"Even if the cable reaches the factory within the next few days, the first rake can roll out only in March," the BEML official said.
Though KMRCL has sent a reminder to the French firm, the cable's delivery is likely to be delayed as the whole of Europe is currently shut for Christmas and New Year. "We are in talks with BEML and will try to get the first rake in February. But before that, we will get the mock-up coach from BEML next week to check if any modifications in design are needed ," a senior KMRCL official said.
A mock-up coach is just a shell with no propulsion. The existing Metro Railway is stuck with two new rakes from Integral Coach Factory, Perambur, as they are not fully compatible with the system being used in the north-south corridor.

1 Public Posts - Sat Dec 30, 2017

1 Public Posts - Sun Dec 31, 2017

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Dec 22
Trains with ARP 15 Dep on: Thu Dec 27
Trains with ARP 30 Dep on: Fri Jan 11
Trains with ARP 120 Dep on: Thu Apr 11

  
  

Rail News

New Trains

Site Announcements

  • Entry# 4073462
    Dec 06 (12:50PM)


    There are some minor changes to the PNR Forum: 1. The main PNR feed will only show UN-predicted (by you) PNRs which are coming in. However, if there are replies, the PNR will show and will bubble to the top. Once you predict the PNR, it will go away from the main...
  • Entry# 4003283
    Nov 14 (11:24AM)


    This is an advance notice of a new feature that will be introduced within the next couple of days. The feature is called "Spottings". . 1. Any time you see a train ANYWHERE - while railfanning, while travelling in a train, while visiting a station, seeing someone off, receiving someone, while your train...
  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy