Forum Super Search
Posting Date From:
Posting Date To:
Train Type:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Full Site Search
Fri Mar 23, 2018 05:47:08 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Mar 23, 2018 05:47:08 IST

Blog Entry# 2969375
Posted: Jan 04 2018 (19:32)

1 Responses
Last Response: Jan 04 2018 (19:32)
Rail News
Other NewsSWR/South Western  -  
Jan 04 2018 (15:44)   Bengaluru City-Mysuru rail line goes electric

Jayashree   38955 news posts
Entry# 2969375   News Entry# 326142         Tags   Past Edits
BENGALURU: Rail travel between Bengaluru and Mysuru will see a big transformation with the completion of the electrification of the 139-km stretch connecting the two important cities of Karnataka.
While doubling itself came as a boon to passengers, electrification will now pave way for the introduction of electric locomotives in a region long served by diesel engines. The switch will lead to substantial saving in costs for the railways.
Operating a diesel loco would cost Rs 40,000 per trip while an electric loco would cut the cost by more than half. "We will
not only save money by moving to electric trains. We will also be using a clean energy source which will help protect our environment," said E Vijaya, chief public relation officer at South Western Railway (SWR).
Besides the significant reduction in carbon emissions, the electric trains run at a higher speed and is easy on maintenance.
Vijaya said the SWR would initially operate the Shatabdi Express (which shuttles between Chennai and Mysuru) using electric locomotives. "We have plans to introduce electric trains in place of three mail and 2-3 passenger trains by March 2018," she added.
The SWR operates 27 pairs of daily passengers, express and superfast trains (including weekly and biweekly) between Mysuru and Bengaluru.
Take your brand to the right consumer this festive seasonColombia Network 10 days' hair oil - New hair growth for sure!Rathira Ayurveda Pvt Ltd Recommended By Colombia
Commuter demand
A railway user group has requested additional train services between the tech city and the heritage city, given the fact that at least 31,000 people use the services daily. Bengaluru-Mysuru is the second busiest route after the Bengaluru-Jolarpettai section.
"Since the Karwar/Kannur express from Bengaluru will skip Mysuru and instead use the newly laid Shravanabelagola line, there will be no passenger trains to Mysuru from Bengaluru between 7 pm and 11.55 pm. It will affect a lot of people including techies," said S Yogendra, convener of Mysore Grahakara Parishat.
As an alternative to the proposed diversion of this train, the forum has requested the authorities to extend 12609/10 KSR Bengaluru-Chennai Superfast Express to Mysuru. "The superfast train from Chennai terminates at Bengaluru at 8.30 pm. Users are requesting that this service be extended to Mysuru," Yogendra said.
"We are considering the appeal," Vijaya said. Krishna Prasad from the Karnataka Railway Vedike wants the railways to commission the electric train services right away instead of waiting for the formalities such as launch by a VVIP.
"The Commissioner of Rail Safety cleared the upgraded line for use last month but the railways is delaying the launch of new services resulting in inconvenience to people as well as losses for the ministry," he said.

Jan 04 2018 (19:32)
knkprasad956*^~   2413 blog posts
Re# 2969375-1            Tags   Past Edits
My remarks are there in the report

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Apr 2
Trains with ARP 15 Dep on: Sat Apr 7
Trains with ARP 30 Dep on: Sun Apr 22
Trains with ARP 120 Dep on: Sat Jul 21


Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)

    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)

    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)

    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)

    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)

    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)

    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom

Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.