Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Mon May 28 07:10:34 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 2973582
Posted: Jan 05 (23:29)

7 Responses
Last Response: Feb 02 (10:35)
  
General Travel
0 Followers
352 views
Jan 05 (23:29)   GY/Gooty Junction (2 PFs)

achyutarama1   282 blog posts   70 correct pred (72% accurate)
Entry# 2973582            Tags   Past Edits
Need to have atleast 3-4 platforms to handle incoming and outgoing trains. This is intersecting point of 4 routes. Only 2 will become huge problem further going

2 posts - Mon Jan 22, 2018

  
278 views
Jan 26 (11:32)
fayazdm~   369 blog posts
Re# 2973582-3            Tags   Past Edits
Even I wonder how do they manage.Now that Gooty Yelahanka Doubling is under progress at least need 3 and 4th platform.Like for example 1 and 2 platforms for Chennai going train's , 3rd and 4th for Bangalore going train's.This way the problem can be solved.

  
320 views
Jan 31 (17:06)
achyutarama1   282 blog posts   70 correct pred (72% accurate)
Re# 2973582-4            Tags   Past Edits
4 routes were intersecting
1. Towards chennai via kadapa, renigunta
2. Towards bangalore via anatapur, dharmavaram
3. Towards dhone
4. Towards guntakal.
Doubling
...
more...
is in almost all the routes except dhone roure. During night time i saw that already 2 platforms were occupied kacheguda chengalpattu expresses and bangalore nanded express and still 3 more trains are waiting on both sides to get platform. If a loco reversal is there for any train then situation is much more difficult. Now a days getting the platform and leaving also a big task in this

  
289 views
Jan 31 (17:22)
Swaroop Kutti   4032 blog posts   170 correct pred (61% accurate)
Re# 2973582-5            Tags   Past Edits
Kadapa route is a double electric route,
Even the line towards GTL is also double electric line
The line towards ATP is single electric line where u get the huge GY curve n doubling is under process
The line towards DHNE is a single electric line which was recently electrified, it would be better if it had 5pfs

  
530 views
Feb 01 (14:23)
fayazdm~   369 blog posts
Re# 2973582-6            Tags   Past Edits
I hope it is included in the union budget of constructing additional platforms for gooty.

  
286 views
Feb 02 (10:35)
highvoltageeee2k3~   368 blog posts
Re# 2973582-7            Tags   Past Edits
It wont happen, they are building a bypass line. Probably they would not do it.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Jun 7
Trains with ARP 15 Dep on: Tue Jun 12
Trains with ARP 30 Dep on: Wed Jun 27
Trains with ARP 120 Dep on: Tue Sep 25

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3444356
    May 23 (12:09PM)


    @all: With the introduction of the pre-moderation scheme for new IDs described here Blog Entry# 3443990-1 and Entry# 3441062 , following is a summary of Forum Guidelines in effect: . 1. Blog Posts by new IDs appear in public ONLY AFTER scrutiny and approval by FMs. A member may create as many Fake IDs as...
  • Entry# 3441062
    May 22 (12:51PM)


    The system detailed here Blog Entry# 3440635 will be rolled out soon. Meanwhile, immediately, to curb the menace of fake IDs, starting tomorrow, all blog posts from New Members will be "PRE-moderated". . What this means is that, UNTIL the member acquires at least 10 public positive Ratings - Great/Thanks, etc. . 1. ALL posted blogs...
  • Entry# 3440635
    May 22 (10:04AM)


    To curb the proliferation of duplicate IDs in IRI, we shall soon be requiring SMS-based authentication to post blogs. . Members will be required to provide a mobile phone number to authenticate their accounts. An OTP will be sent to the number. Upon entering the OTP, the account will be associated with that...
  • Entry# 3416383
    May 14 (12:40PM)


    This an advance announcement of some important changes coming to our Groups. . Pl. read Entry# 2136570 posted more than a year ago. Subsequent to this, some long-pending changes will be introduced in the coming weeks. . At this point, we have many Groups with hundreds of dormant/inactive members who may have left the site...
  • Entry# 3416198
    May 14 (10:27AM)


    The following features have been introduced. Pl. check the relevant screenshots. 1. While Posting News, a new "Fetch Article" button has been added. After you paste the URL in the box, clicking the button will fetch the News Title, Article and all the pics from the page. The Article and Title will...
  • Entry# 3361218
    Apr 29 (10:59PM)


    We shall be having the IRI Moving Convention this year - ONE week long. Route: BCT -> ADI -> JP -> NDLS -> BSB -> HWH -> MAS -> SBC. Dates: July 9 to July 17 Jul 9: BCT -> ADI Jul 10: ADI -> JP Jul 11: JP -> NDLS Jul 12: NDLS -> BSB Jul 13:...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy