Forum Super Search
Posting Date From:
Posting Date To:
Train Type:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Full Site Search
Mon Mar 19, 2018 14:45:44 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Mon Mar 19, 2018 14:45:44 IST

Blog Entry# 2981357
Posted: Jan 08 2018 (16:48)

4 Responses
Last Response: Jan 11 2018 (18:03)
General Travel
Jan 08 2018 (16:48)   01663/Dharwad - Habibganj Special Fare Special

IRtrolling Karnataka since 1956~   133 blog posts
Entry# 2981357            Tags   Past Edits
Has tt of this train changed? instead of UBL-HBJ it's showing DWR-HBJ spl.

Jan 08 2018 (22:24)
hpathak096~   278 blog posts
Re# 2981357-1            Tags   Past Edits
Yes, from next run it will run up to dharwad instead of hubli

Jan 08 2018 (23:15)
visheshcena   12 blog posts   3 correct pred (75% accurate)
Re# 2981357-2            Tags   Past Edits
Not a wise decision by railways to run from and to terminate at Dharwad. For better patronage and facilitating passengers, it should be extended till HUBBALLI Jn.

Jan 11 2018 (11:34)
Koushik Patel~   1277 blog posts   121 correct pred (85% accurate)
Re# 2981357-3            Tags   Past Edits
It will not matter at any cost running upto DWR... Point is, there are no extra pitlines available on Saturday at UBL to accomodate this train between 8.30m to 11pm...
It can be operated by DWR easily... The only issue might be, the issue of non-proper secondary maintenance

Jan 11 2018 (18:03)
Koushik Patel~   1277 blog posts   121 correct pred (85% accurate)
Re# 2981357-4            Tags   Past Edits
In future, If UBL gets congested, DWR will surely come to rescue, as it has 2 platforms and 2 pitlines available.. Problem is only with maintenance, which can be well addressed by setting up there... Afterall SBC ICE also is extended

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu Mar 29
Trains with ARP 15 Dep on: Tue Apr 3
Trains with ARP 30 Dep on: Wed Apr 18
Trains with ARP 120 Dep on: Tue Jul 17


Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)

    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)

    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)

    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)

    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)

    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)

    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom

Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.