Forum Super Search
Posting Date From:
Posting Date To:
Train Type:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Full Site Search
  Full Site Search  
Fri Mar 23, 2018 19:11:57 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Fri Mar 23, 2018 19:11:57 IST

Blog Entry# 2997437
Posted: Jan 13 2018 (11:12)

2 Responses
Last Response: Jan 14 2018 (12:18)
Info Update
Jan 13 2018 (11:12)  

Saif Ali^~   8408 blog posts   151 correct pred (76% accurate)
Entry# 2997437            Tags   Past Edits
MUTP-3A Project Proposed By Mumbai Rail Vikas Corporation(MRVC) With Estimated Cost of ₹.45,000 Crore
Status of Work for Panvel Terminus
210 AC Locals Planned for Mumbai
Metro-4 to be Extended till Ghodbunder Road

Jan 13 2018 (11:16)
SECR Cleanest Zone of IR~   1306 blog posts   41 correct pred (77% accurate)
Re# 2997437-1            Tags   Past Edits
210 :O

Jan 14 2018 (12:18)
Saif Ali^~   8408 blog posts   151 correct pred (76% accurate)
Re# 2997437-2            Tags   Past Edits
1 to Flop Chal Rahi Hai Baaki 210 ka Kya Hoga? Aur IR Loss me Jayega Isse Achcha Fare Kam Karna Chahiye Minimum Rs.20 aur Maximum 160 Rakhna Chahiye
CCG-BA Rs.60
CCG-BVI Rs.100
CCG-BYR Rs.120
CCG-BSR Rs.140
CCG-VR Rs.160
Itna Fare Raha to Hit Hone ke Chance Hai

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Apr 2
Trains with ARP 15 Dep on: Sat Apr 7
Trains with ARP 30 Dep on: Sun Apr 22
Trains with ARP 120 Dep on: Sat Jul 21


Rail News

  • बलिया-गाजीपुर ट्रैक के विद्युतीकरण का परीक्षण शुरू -  News Entry# 332348
    by: Saurabh*^~  Today (18:58)

    बलिया-गाजीपुर रेलवे स्टेशनों के बीच ट्रैक के विद्युतीकरण कार्य का तीन दिनी तकनीकी परीक्षण गुरुवार से शुरू हुआ। डीआरएम, सीएसआर और मंडल चालन प्रबंधक संग तकनीकी टीम ने मोटर ट्राली से कार्य की बारीकियों की जांच की। रेल अधिकारियों के मुताबिक 24 मार्च को विद्युत इंजन चलाने के बाद फाइनल रिपोर्ट...
  • दस साल बाद महोबा रेलवे स्टेशन जंक्शन घोषित  News Entry# 332347
    by: Saurabh*^~  Today (18:34)

    महोबा। दस साल पहले तत्कालीन रेल मंत्री लालू यादव ने हरी झंडी दिखाकर महोबा से खजुराहो रेल लाइन शुरू की थी, तभी महोबा रेलवे स्टेशन जंक्शन बन गया था लेकिन औपचारिक रूप से महोबा स्टेशन को जंक्शन अब घोषित किया गया है। रेल मंत्रालय ने महोबा के अलावा ललितपुर, इटावा, मैनपुरी,...
  • महाबोधि एक्सप्रेस की अब होगी रफ्तार 130 मिलो मीटर प्रति घंटे  News Entry# 332346
    by: Saurabh*^~  Today (18:24)

    गया जंक्शन से दिल्ली जाने वाली महाबोधि एक्सप्रेस सहित लालपरी रैक वाली सभी ट्रेनों के परिचालन की गति सीमा बढ़ा दी गयी है। अब ये ट्रेनें 130 किलोमीटर प्रति घंटे से चलगी। इस संबंध में बुधवार को पूर्व मध्य रेलवे के मुख्य विद्युत अभियंता जे आर मीणा ने वरीय मंडल विद्युत...
  • Railways Approves 500-Crore Project For Faster Commute On Bengaluru's IT Corridor  News Entry# 332345
    by: karbang~  Today (17:03)

    In good news for residents of Bengaluru, the Indian Railways has approved a project that will increase the capacity of suburban rail commuters four-fold by having a provision of two additional rail lines from Bengaluru Cantt to Whitefield. The cost of this project will be nearly Rupees 500 crore, and will...
  • Train services begin on Guntur-G’kal route  News Entry# 332344
    by: karbang~  Today (17:01)

    After getting clearance from commissioner of railway safety (CRS), the South Central Railway (SCR) flagged off express trains on the Guntur-Guntakal track where electrification works were recently taken up.

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)

    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)

    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)

    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)

    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)

    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)

    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom

Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.