Sir, Honnavalli Road PF-1 is connected to the main line towards ASK, this new line has been laid upto ASK outer. At ASK outer new turnouts(changing tracks) have to be laid, but it looked like its ready for laying new turnouts and they may lay them within few weeks. So may be in 2-3months if work goes well ASK=Honnavalli Road doubled line can be opened.
At other stations track linking works have not started nor I have seen those new turnouts lying beside the track.