Spotting
 Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 Correct
 Wrong
 Stamp
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  

बाज़🦅 आ रहा है ~ सिलीगुड़ी WDP-4 20000 Series - Niraj Kumar

Full Site Search
  Full Site Search  
 
Tue Apr 23 15:49:41 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips/Spottings
Login
Feedback
Post BlogPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3091394
Posted: Feb 10 2018 (15:16)

1 Responses
Last Response: Feb 10 2018 (15:16)
  
Rail News
0 Followers
865 views
Other News
BMRC/Bangalore Metro
Feb 10 2018 (15:15)   L&T, Gulermak, Afcons & ITD Lowest Bidders for B’lore Metro’s UG PH2

16591🔹Hampi Express🔹16592^~   3070 news posts
Entry# 3091394   News Entry# 329141         Tags   Past Edits
Four infrastructure firms – Larsen & Toubro, Gulermak, Afcons Infrastructure and Italian-Thai Development have emerged as the lowest bidder for constructing a package each on the 13.92 km Dairy Circle – Nagawara underground section of Bangalore Metro’s 21.415 km Line-4 (Reach 6) of the 72 km Phase 2 project after officials today opened the financial bids packets submitted to this build this section.
Civil construction bids for this underground section’s tunnels, stations, ramps and other allied infrastructure were invited in late-June 2017. Only 4 bidders submitted bids of which Larsen & Toubro submitted bids for only package 2 & 3 – see other interesting notes here.
The
...
more...
bids placed were 67-75% higher than BMRCL’s estimate – see my thoughts at the bottom of this post.
• Package 1 (R6-UG-P1) 3.67 km – South Ramp to Vellara Road Station with 3 stations at Dairy Circle, MICO Industries, Langford Town
Firm Bid
Afcons Rs. 2223.54 cr
Gulermak Rs. 2311.34 cr
ITD Cem Rs. 2337.93 cr
BMRCL’s estimate: Rs. 1268.90 cr
Difference: Rs. 954.64 cr (75.23% higher)
• Package 2 (R6-UG-P2) 3.62 km – Vellara Road Station to Cantonment Station with 3 stations at Vellara Road, MG Road, Shivaji Nagar
Firm Bid
Gulermak Rs. 2219.86 cr
Afcons Rs. 2311.11 cr
L&T Rs. 2333.71 cr
ITD Cem Rs. 2349.70 cr
BMRCL’s estimate: Rs. 1325.97 cr
Difference: Rs. 893.89 cr (67.41% higher)
• Package 3 (R6-UG-P3) 3.32 km – Cantonment Station to Venkateshpura Station with 3 stations at Cantonment, Pottery Town, Tannery Road
Firm Bid
L&T Rs. 2237.58 cr
Gulermak Rs. 2341.32 cr
Afcons Rs. 2361.32 cr
ITD Cem Rs. 2373.35 cr
BMRCL’s estimate: Rs 1334.83 cr
Difference: Rs. 902.75 cr (67.63% higher)
• Package 4 (R6-UG-P4) 3.31 km – Venkateshpura Station to North Ramp with 3 stations at Venkateshpura, Arabic College, Nagawara
Firm Bid
ITD Cem Rs. 1872.47 cr
Gulermak Rs. 1994.41 cr
Afcons Rs. 2010.95 cr
BMRCL’s estimate: Rs. 1117.86 cr
Difference: 754.61 cr (67.50% higher)
Here’s a general alignment of the line. The BMRCL in January decided to stick with their decision to place the Cantonment Station at Bamboo Bazaar (see location) instead of the original location which was closer to the railway station (as depicted below).
Combined totals for all 4 Packages
• Lowest bids: Rs. 8553.45 cr
• BMRCL’s estimates: Rs. 5047.56 cr
• Difference: 3505.89 cr (69.45% higher)
The lowest bid placed in each case was way higher than the BMRCL’s estimate, so either the BMRCL got their calculations wrong or the firms colluded together.
Now that the bids are opened, the BMRCL is staring at a repeat of Phase 1 in which the bids received for Package UG-1 (North Ramp – Majestic – Chickpet – KR Market – South Ramp) of the Green Line were higher than their estimates. The BMRCL subsequently broke it up into 2 packages, with the construction of the Majestic Interchange Station placed under a different package, and re-invited bids.
The BMRCL now has two options, both of which are time consuming –
Reinvite tenders as-is or consolidate into 2 or 3 packages.
Negotiate with the lowest bidders by minimizing the scope of the project (example – reducing number of cross passage tunnels, reducing number of TBMs required, reducing station length or number of entrances). In Mumbai, the MMRCL successfully did that between October 2015 – July 2016 for 7 underground packages on the 33.5 km Line-3. Combined contract values were brought down by 7.45% (compared to the bids) which means the BMRCL has a very small wiggle room available to negotiate.
Both options add a minimum delay of 6 months. Needless to say, contracts for this section’s construction will be awarded only after one of the above options is exercised and successful.

1 Public Posts - Sat Feb 10, 2018

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Fri May 3
Trains with ARP 15 Dep on: Wed May 8
Trains with ARP 30 Dep on: Thu May 23
Trains with ARP 120 Dep on: Wed Aug 21

  
  

Leading Polls

4261512 ★★★ 64Avishek Ray~
3601942  12Aditya~
4298661 ★★ 25nankit0507~
4299326  16◢ ◤RaviRajjr~
4228646 ★★★ 54Avishek Ray~
4297719 ★★★ 34Krishna Kushwah...
4294673 ★★ 2002208 जम्मू तवी...
3368675 ★★★ 27722387⭐ Black Di...
4298148  19WAITING FOR 450...
4217387 ★★★ 41Avishek Ray~
4200382 ★★★ 91Avishek Ray~
4221823 ★★★ 39Avishek Ray~
4297987 ★★ 21Akhildubey790~
4201498 ★★★ 48Avishek Ray~
3978487 ★★★ 41Montez~
4222496 ★★★ 44Avishek Ray~
4133795 ★★★ 113Avishek Ray~
4166936 ★★★ 107Avishek Ray~
4166988 ★★★ 53Avishek Ray~
4166957 ★★★ 120Avishek Ray~
4171050 ★★★ 74Avishek Ray~
4185292 ★★★ 80Avishek Ray~
4212478 ★★★ 72Avishek Ray~
4214850 ★★★ 66Avishek Ray~
4292410 ★★ 26nankit0507~
4296895 ★★★ 51◢ ◤RaviRajjr~

Rail News

New Trains

Site Announcements

  • Entry# 4246530
    Mar 02 2019 (12:59AM)


    @all: Regarding the new SCoR zone, our VSKP and other SCoR members are excited and interested to change the train/station zones. We may let them go ahead with it. This piece of info is NOT critical for trains and TTs which would affect regular passengers - so it's FINE. . We may let them...
  • Entry# 4239625
    Feb 22 2019 (10:22PM)


    @all: This is a repeat warning to all that: Anonymous posting may NOT be used to directly address regular members -> like scolding them, commenting about their blogging habits, arguing with them, or ANY other personal comment/remark against any other member, EVEN if it is not offensive. ANY personal remark (even if not...
  • Entry# 4214881
    Feb 01 2019 (07:45PM)


    This is an advance notice of the last and CORE feature of the RailFan app - Trips/Spottings - which will be enabled next week. A week after that, RailFan will go into Open Beta, whereby all members will be able to download the app without providing their email. . The Trip/Spotting feature of...
  • Entry# 4213057
    Jan 31 2019 (05:45AM)


    A few small enhancements will be made to the site in the coming days, regarding Member profiles. . 1. Hereafter, we shall require REAL permanent names of members. Members will have the option of reporting those whose name is fake or not real. An SW will be issued, whereupon the member will have...
  • Entry# 4205675
    Jan 23 2019 (08:11PM)


    This is an advance notice of a small enhancement to the Forum. Within a couple of days, we shall introduce "anonymous posting" for Blogs and Trips. With "anonymous posting", members will still be required to login to your account and abide by all Forum guidelines, but your name will be hidden...
  • Entry# 4200970
    Jan 18 2019 (10:12PM)


    @all: This is to formally announce the END of the RailCal app. Due to the information blockade, the app has lost its value, and has been rendered completely useless. We are unable to support RailCal anymore. Sorry to disappoint our users. . RailCal has already been taken off the Google PlayStore. So once...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy