Forum Super Search
 ♦ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Search  
 
Wed Feb 21, 2018 22:42:13 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
Wed Feb 21, 2018 22:42:13 IST

Blog Entry# 3105160
Posted: Feb 14 2018 (18:27)

1 Responses
Last Response: Feb 14 2018 (18:27)
  
Rail News
0 Followers
208 views
Other News
Feb 14 2018 (16:35)   Mumbai-Ahmedabad bullet train to start a year earlier

Jayashree ❖ Amita*^   38932 news posts
Entry# 3105160   News Entry# 329488         Tags   Past Edits
The Mumbai-Ahmedabad bullet train that was scheduled to be completed by 2023, has advanced its completion deadline to August 15, 2022.
As per a report, the civil work on the 508km-long Mumbai-Ahmedabad high-speed rail corridor (MAHSR) has been fast-tracked and will begin in June this year.
The railway authorities have advanced the completion deadline so that it coincides with 75 years of India's independence.
In
...
more...
context: Mumbai-Ahmedabad bullet train to start a year earlier 14 Feb 2018 Mumbai-Ahmedabad bullet train to start a year earlier ❮ Modi It is one of PM Modi's signature projects The bullet-train project is one of the Narendra Modi government's signature projects and was launched by the PM along with Japanese PM Shinzo Abe in September 2017.
An official from the implementing body National High-Speed Rail Corporation Ltd (NHSRCL), said, "Geo-technical surveys have already been done and civil works will begin in June 2018 after we receive the green signal for the entire corridor."
Details Tests for the bullet train have already been carried out Tests for the train have already been carried out beneath the seabed for the underground section of the project that aims at reducing travel time between Mumbai and Ahmedabad from 8 hours to 2 hours.
The corridor which falls within the Western Railway zone extends from Bandra-Kurla Complex to Sabarmati.

  
898 views
Feb 14 2018 (18:27)
srinivasvasanthi~   4324 blog posts   15 correct pred (54% accurate)
Re# 3105160-1            Tags   Past Edits
At least all the Metre Gauge and Narrow Gauge tracks have to be Broad Gauge conversion on or before 3/2023 in our Indian Railway systems.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Mar 3
Trains with ARP 15 Dep on: Thu Mar 8
Trains with ARP 30 Dep on: Fri Mar 23
Trains with ARP 120 Dep on: Thu Jun 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom


Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.