Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Mon Apr 23, 2018 05:41:35 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3105594
Posted: Feb 14 2018 (20:07)

No Responses Yet
  
Rail News
0 Followers
393 views
Commentary/Human InterestSR/Southern  -  
Feb 14 2018 (09:05)   Track doubling work gets over; awaits inspection

karbang~   553 news posts
Entry# 3105594   News Entry# 329443         Tags   Past Edits
With the completion of the second railway line from Solagampatti to Thanjavur under the Golden Rock - Thanjavur track doubling project, the stretch is all set for mandatory inspection by the Commissioner of Railway Safety (CRS), Southern Circle, Bengaluru, soon.
Commissioner of Railway Safety K. A. Manoharan will carry out statutory inspection of the second railway line laid on the stretch from Solagampatti to Thanjavur on February 19 and 20. Besides inspecting the newly laid second track to gauge its stability, the CRS would also inspect major bridges constructed as part of the doubling project and stations en route.
The
...
more...
entire doubling project from Golden Rock in Tiruchi to Thanjavur (48 km) has been executed by the Rail Vikas Nigam Limited (RVNL), a Government of India enterprise under the Ministry of Railway. The first portion from Golden Rock to Solagampatti (19 km) was completed in July last year following which the CRS carried out mandatory inspection and accorded clearance for operation of rail traffic on the newly laid second railway line on this section.
Works which were being simultaneously carried out in the remaining portion from Solagampatti to Thanjavur have now been completed paving the way for CRS inspection. A senior RVNL official told The Hindu on Tuesday that the CRS would conduct inspection travelling on board a motor trolley on February 19 followed by a speed trial run the next day.
As part of the project, a new station building has been constructed at Budalur and high level platforms to accommodate 18 coaches have been laid at Aiyanavaram. In addition to these, the RVNL has constructed 43 bridges, including 11 major ones, on the stretch from Solagampatti to Thanjavur under the doubling project.
The entire doubling project from Ponmalai to Thanjavur has been completed at a cost of around ₹ 400 crore, said the official. Doubling of the Thanjavur-Golden Rock section was proposed a few years ago by the Southern Railway as the existing single line in this section had got saturated with daily operation of passenger, express and freight trains.
The laying of a second railway line would pave the way for operation of more trains in future and also reduce time delay due to crossings.
The completion of the track doubling works is now expected to give a push to the ongoing overhead electrification works in the Tiruchi - Thanjavur broad gauge section.
The Central Organisation of Railway Electrification (CORE) is presently carrying out electrification works from Tiruchi to Solagampatti. It was awaiting the completion of the track doubling works from Solagampatti to Thanjavur.
With doubling works having been completed, the CORE would speed up the overhead electrification works and the plan was to complete electrification works by June, said a CORE official.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu May 3
Trains with ARP 15 Dep on: Tue May 8
Trains with ARP 30 Dep on: Wed May 23
Trains with ARP 120 Dep on: Tue Aug 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.