Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Apr 25, 2018 20:29:38 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3168399
Posted: Mar 04 2018 (10:16)

2 Responses
Last Response: Mar 04 2018 (12:45)
  
Rail News
0 Followers
763 views
Mar 04 2018 (08:44)   Tiruchi - Thanjavur second line ready for rail traffic

Form Cavery management and save Delta of TN~   9 news posts
Entry# 3168399   News Entry# 330700         Tags   Past Edits
RVNL has constructed 16 major bridges on the stretch
The statutory clearance from the Commissioner of Railway Safety, Southern Circle, Bengaluru, has paved the way for operation of rail services in the second railway line laid up to Thanjavur from Golden Rock in Tiruchi.
The Commissioner of Railway Safety (CRS) who carried out mandatory inspection last month in the 28-kilometre stretch from Solagampatti to Thanjavur Junction accorded clearance for operation of rail traffic.
The
...
more...
Solagampatti- Thanjavur stretch forms part of the track doubling project executed in the 48-kilometre section from Golden Rock to Thanjavur.
The doubling project in the entire section was executed by the Rail Vikas Nigam Limited (RVNL), a Government of India enterprise under the Ministry of Railways.
The CRS had already authorised the first portion from Golden Rock to Solagampatti (19 km) for operation of rail traffic after carrying out mandatory inspection last year.
Works were then underway in the second portion of the doubling project from Solagampatti to Thanjavur. Upon completion of all works, the CRS carried out a two-day mandatory inspection from Solagampatti to Thanjavur last month.
The inspection concluded with a high speed trial run by the CRS on a board a special train.
Railway sources told The Hindu that the statutory clearance from the CRS for operation of rail traffic in the remaining portion from Solagampatti to Thanjavur came a few days ago.
The statutory clearance has now paved the way for operation of rail traffic up to Thanjavur from Tiruchi on the newly laid second railway line, said the sources. Till now, trains were operated on the second railway line only up to Solagampatti from Tiruchi since that portion alone was cleared.
The RVNL has planned to complete the remaining minor works in the portion from Solagampatti to Thanjavur before this month-end after which services up to Thanjavur from Tiruchi on the second railway line are expected to be operated.
Delay due to crossings in the Tiruchi- Thanjavur broad gauge section would not arise henceforth with the second railway line set to become operational soon, the sources said.
The second railway line would enable the railway authorities to operate more trains from Tiruchi to Thanjavur.
The RVNL which was entrusted with the task of executing the doubling project had constructed new station buildings at Tiruverumbur, Thondamanpatti, Solagampatti and Budalur.
All the 15 level crossing gates from Golden Rock to Thanjavur have been manned with the RVNL constructing 16 major bridges in that stretch as part of the doubling project completed at a cost of around Rs. 300 crore.
The second railway line was laid as the existing single line on this strect had reached saturation.
The section is also being electrified simultaneously as part of the Tiruchi - Thanjavur-Tiruvarur- Karaikal electrification project.
The project is being executed by the Central Organisation of Railway Electrification

  
3639 views
Mar 04 2018 (10:16)
karthik2180~   295 blog posts   1 correct pred (50% accurate)
Re# 3168399-1            Tags   Past Edits
Very gud news may soon line block

  
3045 views
Mar 04 2018 (12:45)
srinivasvasanthi~   4441 blog posts   15 correct pred (54% accurate)
Re# 3168399-3            Tags   Past Edits
Congrats to RVNL which has completed Trichy to Thanjavur Railway track doubling in time.
Normally RVNL takes 50 % extra time to complete any projects.
Hope the entire Trichy to Karaikkal Electrification completed by 3/ 2019,So as to operate seamlessly more and more trains from Salem,Erode ,Madurai and Villuppuram

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat May 5
Trains with ARP 15 Dep on: Thu May 10
Trains with ARP 30 Dep on: Fri May 25
Trains with ARP 120 Dep on: Thu Aug 23

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.