Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Fri Apr 20, 2018 22:34:05 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback

Blog Entry# 3178659
Posted: Mar 07 2018 (08:50)

5 Responses
Last Response: Mar 08 2018 (13:22)
  
Rail News
0 Followers
592 views
IR AffairsNR/Northern  -  
Mar 07 2018 (08:00)   रेल विद्युतीकरण के स्टील घोटाले में महाप्रबंधक पर गाज

Aaditya^~   6362 news posts
Entry# 3178659   News Entry# 330870         Tags   Past Edits
केंद्रीय रेल विद्युतीकरण संगठन (कोर) के महाप्रबंधक को हटाया गया1
कार्रवाई
जागरण प्रभाव
संकट
दैनिक जागरण ने किया था मामला उजागर
Click
...
more...
here to enlarge image
दीपक बहल ’ अंबाला1रेल विद्युतीकरण प्रोजेक्ट में हुए करोड़ों रुपये के घोटाले में केंद्रीय रेल विद्युतीकरण संगठन (कोर) के महाप्रबंधक सत्य प्रकाश त्रिवेदी पर गाज गिरी है। उनका तबादला कपूरथला (पंजाब) स्थित रेल कोच फैक्ट्री कर दिया गया है। संदेह के घेरे में आए कई और अधिकारियों पर भी गाज गिरना तय है। 1यह है मामला: रेलवे विद्युतीकरण के दौरान उपयोग किए जाने वाले स्ट्रक्चर्स (ट्रैक के बगल लगाए जाने वाले खंभे और ढांचे जो बिजली के तारों को थामते हैं) में स्टील का वजन मानक से करीब 13 से 15 फीसद कम पाया गया था। अंबाला स्थित विद्युतीकरण कार्यालय से जम्मू से उधमपुर, उधमपुर से कटरा और गाजियाबाद से मुरादाबाद के तीन अलग सेक्शन में बड़े पैमाने पर गड़बड़झाला हुआ था। इसकी जांच कोर की विजिलेंस टीम कर रही है। दैनिक जागरण ने 24 फरवरी को इस मामले को उजागर किया था। 1पीएमओ ने लगाई मुहर: इस प्रकरण में महाप्रबंधक के तबादले की अनुमति के लिए फाइल रेल मंत्रलय से प्रधानमंत्री कार्यालय पहुंची, जहां कोर के महाप्रबंधक के तबादले पर मुहर लगा दी गई। मामले में विजिलेंस को भी जल्द जांच निपटाने के आदेश दिए गए हैं। 1इन पर तय: मामले में अब मटीरियल रिसीव सर्टिफिकेट (एमआरसी) पर हस्ताक्षर करने वाले अधिकारियों की भी मुश्किलें बढऩी तय है। इन अधिकारियों ने तीनों प्रोजेक्टों पर स्टील का वजन कर ओके की रिपोर्ट दी, जबकि 13 से 15 फीसदी स्टील कम है। 1सामान्य प्रक्रिया नहीं यह तबादला: सूत्र बताते हैं पदोन्नति या फिर किसी मामले पर ही जीएम रैंक के अधिकारी का तबादला किया जाता है। सत्य प्रकाश त्रिवेदी केंद्रीय ने रेल विद्युतीकरण संगठन (कोर), इलाहाबाद के महाप्रबंधक का पदभार 10 सितंबर 2016 को ग्रहण किया था। इससे पूर्व वह पश्चिम मध्य रेलवे जबलपुर में अपर महाप्रबंधक थे।24 फरवरी को ‘जागरण विशेष’ के रूप में खबर प्रकाशित की गई थी, जिसमें इस मामले का पर्दाफाश किया गया था। ‘अफसरों ने दांव पर लगा दी यात्रियों की सुरक्षा, खंभों में घटाया स्टील’, शीर्षक से समाचार प्रकाशित होने के बाद रेल मंत्रलय ने कोर के आला अधिकारियों से जवाब तलब किया था।दैनिक जागरण में 24 फरवरी को प्रकाशित खबर ’’>>संदेह के घेरे में आए अन्य अधिकारियों पर भी लटकी तलवार 1’>>मानक से कम वजन का स्टील किया गया था इस्तेमाल

  
1411 views
Mar 07 2018 (08:50)
deepakrashikendra~   1334 blog posts
Re# 3178659-1            Tags   Past Edits
Estimate are also inflated by CORE in order to make money in RE projects
It is high time to have Lokpal

  
862 views
Mar 07 2018 (13:52)
a2z~   2923 blog posts
Re# 3178659-2            Tags   Past Edits
Inflation of Project cost on one hand is financially killing IR and poor execution of projects qualitatively as well as quantitatively on the other hand is severly jeopardising the safety, operation & maintenance of IR. Cost per KM of new line/ guage conversion/ electrification etc appears to be increasing much faster than the rate of inflation.

  
826 views
Mar 07 2018 (13:57)
Obi Wan has taught you well~   3768 blog posts   1666 correct pred (74% accurate)
Re# 3178659-3            Tags   Past Edits
even though the standards of materials used are pretty much the same; same tensioning in wires, same weight sleepers etc

  
703 views
Mar 07 2018 (15:03)
a2z~   2923 blog posts
Re# 3178659-4            Tags   Past Edits
BG track standard is clipped at 160kmph design speed since decades. If IR construct tracks for much higher axle load & higher permissible speed with stronger foundations, heavier rails, sturdier sleepers, better signalling etc, then steep cost escalation is justified.

  
694 views
Mar 08 2018 (13:22)
Obi Wan has taught you well~   3768 blog posts   1666 correct pred (74% accurate)
Re# 3178659-5            Tags   Past Edits
even tensioning in OHE is based on 160 MPS
and 160 still looks good when you consider that most of the country, even in plains, barely supports speed over 100

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Apr 30
Trains with ARP 15 Dep on: Sat May 5
Trains with ARP 30 Dep on: Sun May 20
Trains with ARP 120 Dep on: Sat Aug 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.