Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sun Apr 22, 2018 03:13:06 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3179491
Posted: Mar 07 2018 (13:29)

1 Responses
Last Response: Mar 07 2018 (13:29)
  
Rail News
0 Followers
140 views
Other NewsBMRC/Bangalore Metro  -  
Mar 07 2018 (13:10)   BBMP starts work on skywalk between metro, rail stations, ignores better options

16229🔹Mysuru↔️Varanasi Express🔹16230^~   2256 news posts
Entry# 3179491   News Entry# 330883         Tags   Past Edits
The BBMP has started work on a skywalk between Kempegowda Metro Station and the third entry to the railway station in Majestic, a facility which experts say will only benefit advertisers while inconveniencing passengers.
In August 2016, the railways wrote to Bangalore Metro Rail Corporation Ltd (BMRCL) to provide safe access to the third entry of Krantiveera Sangolli Rayanna station.
However, the BBMP soon intervened, stating that it has already called tenders to build a skywalk. Last week, Gandhinagar MLA Dinesh Gundu Rao performed the ground-breaking ceremony. Officials in the BBMP said the
...
more...
skywalk, to be built under PPP model, will be ready within five months.
Passengers, however, questioned the need for a skywalk when the existing subway in front of Metro station can be extended to the third entry. "The hassle of coming out of the Metro station and climbing onto the skywalk can be entirely avoided by extending the subway, which provides connectivity at the same level,” said Ramamurthy R, a civil engineer who regularly commutes from Kengeri to Jayanagar.
A senior BMRCL official said the five-metre underground section at the north-west corner of Kempegowda Metro station can be used to build a subway. "A box-type subway of 50-metre length can be built in a month. It seems a better option any day,” the official said.
Civic evengelist V Ravichandar said infrastructure like skywalks should be avoided at all circumstances unless they prove essential. "Ideally, a pedestrian crossing over the road prefers grade-level crossing. Forcing people with luggage to climb two levels at the city centre, when there are better options shows that convenience of pedestrians is not the priority of the BBMP,” he
said.
Activist Sanjeev Dyamannavar noted that Metro passengers already climb two or three levels up to come out of the station while railway passengers come with family carrying luggage and children. "The BBMP can extend the foot overbridge of BMTC bus station instead of building another bridge in front of Metro station, which will benefit only the advertisers. Extension of subway is the ideal solution for the problem,” they said.
For the BBMP, the moot point seems to be the expenditure. "The corporation is not spending anything on the skywalk. The private agency will build it as per the tender specifications. The cost may go up to Rs 2 crore,” an official said.

  
1151 views
Mar 07 2018 (13:29)
Obi Wan has taught you well~   3768 blog posts   1666 correct pred (74% accurate)
Re# 3179491-1            Tags   Past Edits
makes sense
you can't put up ugly hoarding on subway, you can however do so on sky walks :P

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed May 2
Trains with ARP 15 Dep on: Mon May 7
Trains with ARP 30 Dep on: Tue May 22
Trains with ARP 120 Dep on: Mon Aug 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.