5 crossings for RC yesterday, in 25 km KNP-LD section !!
1.17317 UBL-LTT was looped at KNP, waiting for RC, as this was 1 hr late.
2.Poorna Exp and Goa Exp were both looped at Gunji, waiting for RC to arrive at Gunji. Goa left before Poorna.
RC was made to wait at Gunji, as 11022 Dadar Exp was running 2...
more... hrs late. Even 11022 halted at Gunji, as Goa Exp was ahead of it, by around 10 kms.
Poorna Exp has been heavily slowed down. It is getting trolled like anything..
3.Finally, 5th crossing at Londa with UBL-BGM pass, waiting on pf 3, with LP, ALP, Guard and countable number of passengers!