Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sun Apr 22, 2018 10:56:20 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3187885
Posted: Mar 09 2018 (19:27)

2 Responses
Last Response: Mar 09 2018 (20:23)
  
Rail News
0 Followers
232 views
New Facilities/TechnologyDMRC/Delhi Metro  -  
Mar 09 2018 (19:26)   CMRS Approves Commercial Operations on Delhi Metro’s Pink Line

16229🔹Mysuru↔️Varanasi Express🔹16230^~   2259 news posts
Entry# 3187885   News Entry# 331053         Tags   Past Edits
For viewing images related to this article click here
The Delhi Metro Rail Corporation on Thursday evening announced that they’ve received the final statutory approval from the Commissioner of Metro Rail Safety (CMRS) for starting commercial operations on the 20.6 km Majlis Park – Durgabai Deshmukh South Campus section of Delhi Metro’s new 58.59 km Pink Line (Line-7).
The CMRS had conducted a thorough 3-day final inspection of the line between February 26-28, and at this time it isn’t known if the approval was outright or conditional. If conditional, I’ll add the conditions
...
more...
below whenever they are known.
This is what Anuj Dayal, DMRC’s Executive Director of Corporation Communications, mentioned in a brief press release –
The DMRC has received the clearance from the Commissioner of Metro Rail Safety (CMRS) for the opening of the Majlis park-Durgabhai Deshmukh 20.6 km long Metro section on Thursday. This line is likely to be opened for commercial operations next week after completion of all stipulations specified in the sanction.
Inauguration and commercial launch dates haven’t been announced yet and now depends on (1) how quickly DMRC takes corrective action in meeting the CMRS’ requirements & suggestions (if any) for safely operating the line, and (2) the availability of local & national ministers wanting to attend the event.
This 20.6 km section of the line includes 12 stations (8 elevated and 4 underground) at Majlis Park, Azadpur (interchange with Yellow Line), Shalimar Bagh, Netaji Subhash Place (interchange with Red Line), Shakurpur, Punjabi Bagh West, ESI Hospital, Rajouri Garden (interchange with Blue Line), Mayapuri, Naraina Vihar, Delhi Cantonment and South Campus –
Images from the first day of inspections can be viewed here and some from inside Naraina Vihar Station can be viewed here.
Stay tuned for the inauguration and launch dates to be announced. It’s only a matter of a couple days now.

  
1299 views
Mar 09 2018 (19:27)
16229🔹Mysuru↔️Varanasi Express🔹16230^~   3953 blog posts   16 correct pred (94% accurate)
Re# 3187885-1            Tags   Past Edits
20 km Majlis Park – South Campus section map
Source: click here

  
989 views
Mar 09 2018 (20:23)
Guest: 39081f74   show all posts
Re# 3187885-2            Tags   Past Edits
Great News Yamuna Vihar-Anand Vihar and Nizmmuddin-Lajpat Nagar section bhi jaldi open karwao please

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Wed May 2
Trains with ARP 15 Dep on: Mon May 7
Trains with ARP 30 Dep on: Tue May 22
Trains with ARP 120 Dep on: Mon Aug 20

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.