Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Fri Apr 20, 2018 03:12:16 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback

Blog Entry# 3188723
Posted: Mar 10 2018 (00:59)

1 Responses
Last Response: Mar 10 2018 (00:59)
  
Rail News
0 Followers
159 views
Other NewsBMRC/Bangalore Metro  -  
Mar 10 2018 (00:57)   ITD Cem Casts 1st Pier for Bangalore Metro’s Line-3 at Electronic City

16229🔹Mysuru↔️Varanasi Express🔹16230^~   2230 news posts
Entry# 3188723   News Entry# 331086         Tags   Past Edits
For viewing images related to this article click here
Workers from the ITD – ITD India Cem JV today completed casting their first pier for Bangalore Metro’s 19.143 km Line-3 which will connect Bommasandra and RV Road stations under the 73.95 km Phase 2 project.
Piling work to build this pier’s foundation began in August 2017 – a few months after ITD Cementation won Reach-5’s 6.418 km Package-1 (Bommasandra – Hosa Road) in April 2017 for a value of Rs. 485.52 crores. Workers began tying rebar for the first set of piers in
...
more...
November and began shuttering work using casting molds (formwork) in early February 2018.
The pier is located just north of the U-shaped grade separator over Hosur Road near Aisin NTTF’s office in Electronic City
ITD Cem has taken about 11 months to cast their first pier for this line since receiving the letter of award (LoA) in April 2017. For comparison, IL&FS ECC on Reach-2A (Mysore Road – Pattanagere) took 17 months, Soma Enterprise on Reach-2B (Pattanagere – Challagatta) took 10 months, NCC on Reach-4B (Yelachenahalli – Anjanapura Township) took 9 months, and ITD Cem on Reach-1B (Visvesvaraya Industrial Area Station – Whitefield) took just 7 months.

  
1395 views
Mar 10 2018 (00:59)
16229🔹Mysuru↔️Varanasi Express🔹16230^~   3902 blog posts   16 correct pred (94% accurate)
Re# 3188723-1            Tags   Past Edits
Purple Star: location of Line-3’s 1st pier
Source: click here

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Mon Apr 30
Trains with ARP 15 Dep on: Sat May 5
Trains with ARP 30 Dep on: Sun May 20
Trains with ARP 120 Dep on: Sat Aug 18

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.