Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Sat Apr 21, 2018 07:32:54 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback

Blog Entry# 3189104
Posted: Mar 10 2018 (08:43)

7 Responses
Last Response: Apr 04 2018 (18:12)
  
★  General Travel
1 Followers
1233 views
Mar 10 2018 (08:43)   RE/Rewari Junction

हिसार जंक्शन~   1685 blog posts   11 correct pred (52% accurate)
Entry# 3189104            Tags   Past Edits
Energization of GGN-RE track !!

2 posts - Wed Apr 04, 2018

  
Apr 04 2018 (17:15)
visluc1991~   333 blog posts   65 correct pred (68% accurate)
Re# 3189104-3            Tags   Past Edits
Dec GGN sirf poles lage hai wo bhi tedhe.

  
529 views
Apr 04 2018 (17:21)
Shubham Yadav   3210 blog posts   5655 correct pred (77% accurate)
Re# 3189104-4            Tags   Past Edits
nahi
m kal hi travel kiya
poles lage h
kuch jagah wiring h
mostly wiring nahi h
TSS
...
more...
ki foundation start ki h bus

  
471 views
Apr 04 2018 (17:33)
Electrified100~   133 blog posts   11 correct pred (72% accurate)
Re# 3189104-5            Tags   Past Edits
Ye bas target poora karne ke liye notification daal dete. Nahi to kucch nahi kiya to report nikal jaayegi. Aise hi chalte hai jyaadatar projects.

  
434 views
Apr 04 2018 (18:07)
Kushagra^~   647 blog posts   1773 correct pred (64% accurate)
Re# 3189104-6            Tags   Past Edits
i think energized to isliye karte hai taaki chor wire na le jaye

  
418 views
Apr 04 2018 (18:12)
Electrified100~   133 blog posts   11 correct pred (72% accurate)
Re# 3189104-7            Tags   Past Edits
Ha wo 2.2 kV pass karna hota hai chori se bachne ke liye, 25kV fully electrified hone ke baad But, uske liye poori wiring honi chaahiye. Agar notification nikal di hai iska matlab unka kaam almost ho gya hai. Isi case me 31 march ka due tha energization, just dikhaane ke liye ki kaam ho jaayega. Aise hi projects ki deadline show kar dete hai.

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Tue May 1
Trains with ARP 15 Dep on: Sun May 6
Trains with ARP 30 Dep on: Mon May 21
Trains with ARP 120 Dep on: Sun Aug 19

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.