Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 FM Approval
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Freq Contact:
Member:
Posting Date From:
Posting Date To:
Blog Category:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Wed Sep 19 01:37:59 IST
Home
Trains
ΣChains
Atlas
PNR
Forum
Gallery
News
FAQ
Trips
Login
Feedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3189302
Posted: Mar 10 (09:58)

1 Responses
Last Response: Mar 10 (09:58)
  
Rail News
0 Followers
250 views
Other News
BMRC/Bangalore Metro
Mar 10 (09:56)   ITD Cem Begins Launching Segments for Bangalore Metro’s Reach 1A

16591🔹Hampi Express🔹16592^~   2919 news posts
Entry# 3189302   News Entry# 331112         Tags   Past Edits
For viewing images & video related to this article click here
Last night, a crew from ITD Cementation India last launched their first precast segment near Phoenix Hypercity Mall in Mahadevapura for building Bangalore Metro’s 8.039km Reach 1A between the existing Baiyappanahalli Station and the upcoming Visvesvaraya Industrial Area Station as part of the 15.257 km eastern extension of the 18 km Purple Line.
This milestone was accomplished by ITD about 11 months after they won a Rs. 689.51 crore contract for constructing this section from the Bangalore Metro Rail Corporation Ltd in
...
more...
April 2017. Piling work at this location began soon after in June and the first pier was cast in December.
ITD began setting up their launching gantry crane in front of the local HP fuel station in early February.
Overall, this is the 5th package of the city’s 73.95 km Phase 2 project, after Reach 4B (Yelachenahalli – Anjanapura Township), Reach 2A (Mysore Road – Pattanagere), Reach 2B (Pattanagere – Challeghata) and Reach 1B (Visvesvaraya Industrial Area – Whitefield), where segment launching work has started.
Things on this line are progressing nicely wherever the contractor has a clear right-of-way, but land acquisition still remains a concern for the other parts, especially the 2 km Baiyappanahalli – KR Puram stretch where work briefly commenced at one site near Tin Factory in October 2017 but has been visibly on-hold since January, possibly due to a fatal truck accident.
Here are some details from BMRCL’s February newsletter for the entire eastern extension (Reach 1A & 1B) to Whitefield. I’ll update this section whenever the March newsletter is released.

Compensation package in respect of 286 properties amounting to ₹ 1005.44 Crores have been sent to SLAO, KIADB. SLAO has made payment in respect of 223 properties amounting to ₹ 856.10 Crores.
In respect of Electric Utility Shifting of 52 properties, package in respect of 47 properties have been sent to SLAO. Building valuation report in respect of 5 properties is awaited from the Engineering section.
In respect of 39 properties required for electrical utilities (additional) and additional lands from Indian Tin Industry to White field, Land Committee has given the land valuation report. Building valuation report is awaited from the Engineering section.
Out of 34 Properties measuring 5368.54 sq meters required for viaduct between Jyothipura Station and K.R. Puram Station, packages in respect of 31 properties have been sent to Accounts section for verification. Building valuation report in respect of 3 properties is awaited from the Engineering section.
Packages in respect of 8 properties measuring 312.48 Sq meters required for shifting of Electrical Towers has been sent to SLAO for payment of 8 which compensation has been paid in the five cases.
28(1) notification for lands between Baiyappanahalli and Jyothipura is sent to Government from Spl. Deputy Commissioner, KIADB, on 05.01.2018 and awaiting for Government Approval.
28(1) notification for B. Narayanapura Survey No. 75 to an extent of 2925.73 sq, mtrs. has been published on 18.01.2018 in the official Gazette.
Packages in respect of 42 properties required for viaduct from Tin Factory to K.R. Puram Station (Vijinapur village) has been sent to Accounts section for verification

1 Public Posts - Sat Mar 10, 2018

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Sat Sep 29
Trains with ARP 15 Dep on: Thu Oct 4
Trains with ARP 30 Dep on: Fri Oct 19
Trains with ARP 120 Dep on: Thu Jan 17

  
  

Rail News

New Trains

Site Announcements

  • Entry# 3710716
    Aug 14 2018 (11:04AM)


    This is regarding the appointment of Monitors. For TLMs, we require a minimum of 1000 Confirmed TLs. For FMs, we require members to promise to abide by the guidelines and be free of controversies. For other Monitors, we require the member to be in good standing. . However, "eligibility" does NOT always mean...
  • Entry# 3645007
    Jul 20 2018 (03:28PM)


    This is an advance notice of an upcoming change: 1. We shall be removing the Login/Forum section from the RailCal app as it is cumbersome, buggy and lacking in features. . 2. We shall soon be introducing a dedicated app called "Rail Messenger" for both Android and iOS, for all blogging/messaging purposes. The app...
  • Entry# 3644431
    Jul 20 2018 (12:42PM)


    The following changes are being made: 1. To restore the fun back to PNR Predictions, PNR Predictions will NOT be hidden anymore. PNR Predictions by members can be seen by ALL, before and after Charting. New members often look towards our expert predictors for hints, and we are reinstanting that. . 2. To better...
  • Entry# 3601043
    Jul 04 2018 (12:36PM)


    @all: While we do nominally allow multiple IDs, these multiple IDs are NOT allowed to engage in misuse and "mischief". Voting multiple times in the same poll using multiple IDs, rating each other IDs' blogs using multiple IDs, etc. are classified as "gross misuse". . This is an advance notice that some of the...
  • Entry# 3555168
    Jun 20 2018 (10:33PM)


    @all: IRI is a PUBLIC information website, like Wikipedia. The voluntarily posted Blogs, Train/Station Tips, Train/Station Pics, Polls, Train TTs, PNRs, etc. comprise the permanent publicly viewable and searchable repository of IRI. A PUBLIC info website is unlike WhatsApp, FaceBook, Instagram, etc. where people post personal pics and other stuff, which CAN...
  • Entry# 3535285
    Jun 15 2018 (08:28PM)


    This is a clarification to all members regarding our Forum Guidelines and the FM Group. SWs are issued for very clear cases of abuse and misbehaviour by a member. . At this time, we have had many members against whom SW is issued claim that: "I am a long-time member of IRI, and have...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Important Note: This website NEVER solicits for Money or Donations. Please beware of anyone requesting/demanding money on behalf of IRI. Thanks.
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.
India Rail Info Privacy Policy