Timeline
 Travel Tip
 Trip
 Race
 Social
 Greeting
 Poll
 Img
 PNR
 Pic
 Blog
 News
 Conf TL
 RF Club
 Convention
 Monitor
 Admin
 Followed
 Rating
 HJ
 Vote
 Pred
 @
 FM Alert
 Pvt
Forum Super Search
 ↓ 
×
HashTag:
Member:
Posting Date From:
Posting Date To:
Train Type:
Train:
Station:
ONLY with Pic/Vid:
Sort by: Date:     Word Count:     Popularity:     
Public:    Pvt: Monitor:    RailFan Club:    

Search
  Go  
Full Site Search
  Full Site Search  
 
Mon Apr 23, 2018 01:53:54 ISTHomeTrainsΣChainsAtlasPNRForumGalleryNewsFAQTripsLoginFeedback
PostPost Trn TipPost Stn TipAdvanced Search

Blog Entry# 3189302
Posted: Mar 10 2018 (09:58)

1 Responses
Last Response: Mar 10 2018 (09:58)
  
Rail News
0 Followers
144 views
Other NewsBMRC/Bangalore Metro  -  
Mar 10 2018 (09:56)   ITD Cem Begins Launching Segments for Bangalore Metro’s Reach 1A

16229🔹Mysuru↔️Varanasi Express🔹16230^~   2259 news posts
Entry# 3189302   News Entry# 331112         Tags   Past Edits
For viewing images & video related to this article click here
Last night, a crew from ITD Cementation India last launched their first precast segment near Phoenix Hypercity Mall in Mahadevapura for building Bangalore Metro’s 8.039km Reach 1A between the existing Baiyappanahalli Station and the upcoming Visvesvaraya Industrial Area Station as part of the 15.257 km eastern extension of the 18 km Purple Line.
This milestone was accomplished by ITD about 11 months after they won a Rs. 689.51 crore contract for constructing this section from the Bangalore Metro Rail Corporation Ltd in
...
more...
April 2017. Piling work at this location began soon after in June and the first pier was cast in December.
ITD began setting up their launching gantry crane in front of the local HP fuel station in early February.
Overall, this is the 5th package of the city’s 73.95 km Phase 2 project, after Reach 4B (Yelachenahalli – Anjanapura Township), Reach 2A (Mysore Road – Pattanagere), Reach 2B (Pattanagere – Challeghata) and Reach 1B (Visvesvaraya Industrial Area – Whitefield), where segment launching work has started.
Things on this line are progressing nicely wherever the contractor has a clear right-of-way, but land acquisition still remains a concern for the other parts, especially the 2 km Baiyappanahalli – KR Puram stretch where work briefly commenced at one site near Tin Factory in October 2017 but has been visibly on-hold since January, possibly due to a fatal truck accident.
Here are some details from BMRCL’s February newsletter for the entire eastern extension (Reach 1A & 1B) to Whitefield. I’ll update this section whenever the March newsletter is released.

Compensation package in respect of 286 properties amounting to ₹ 1005.44 Crores have been sent to SLAO, KIADB. SLAO has made payment in respect of 223 properties amounting to ₹ 856.10 Crores.
In respect of Electric Utility Shifting of 52 properties, package in respect of 47 properties have been sent to SLAO. Building valuation report in respect of 5 properties is awaited from the Engineering section.
In respect of 39 properties required for electrical utilities (additional) and additional lands from Indian Tin Industry to White field, Land Committee has given the land valuation report. Building valuation report is awaited from the Engineering section.
Out of 34 Properties measuring 5368.54 sq meters required for viaduct between Jyothipura Station and K.R. Puram Station, packages in respect of 31 properties have been sent to Accounts section for verification. Building valuation report in respect of 3 properties is awaited from the Engineering section.
Packages in respect of 8 properties measuring 312.48 Sq meters required for shifting of Electrical Towers has been sent to SLAO for payment of 8 which compensation has been paid in the five cases.
28(1) notification for lands between Baiyappanahalli and Jyothipura is sent to Government from Spl. Deputy Commissioner, KIADB, on 05.01.2018 and awaiting for Government Approval.
28(1) notification for B. Narayanapura Survey No. 75 to an extent of 2925.73 sq, mtrs. has been published on 18.01.2018 in the official Gazette.
Packages in respect of 42 properties required for viaduct from Tin Factory to K.R. Puram Station (Vijinapur village) has been sent to Accounts section for verification

  
1942 views
Mar 10 2018 (09:58)
16229🔹Mysuru↔️Varanasi Express🔹16230^~   3953 blog posts   16 correct pred (94% accurate)
Re# 3189302-1            Tags   Past Edits
Yellow star: where segment launching has commenced
Source: click here

ARP (Advanced Reservation Period) Calculator

Reservations Open Today @ 8am for:
Trains with ARP 10 Dep on: Thu May 3
Trains with ARP 15 Dep on: Tue May 8
Trains with ARP 30 Dep on: Wed May 23
Trains with ARP 120 Dep on: Tue Aug 21

  
  

Rail News

New Trains

Site Announcements

  • Entry# 2547009
    Oct 16 2017 (10:21PM)


    As per the recent post , the new Pax Login feature has now been introduced. Here are the details of the feature set. . 1. Now you may login to the site as a Member or a Passenger, or BOTH Member & Passenger at the same time. Passenger login is called "Pax Login"...
  • Entry# 2517609
    Oct 11 2017 (09:33AM)


    As detailed here , last month, some changes were made to the PNR section. In the next phase of this rollout, we shall be further separating "Passengers" from "Members". . 1. "Passengers" will be able to login using ONLY their PNRs (no password). We shall have a Pax Login above the current...
  • Entry# 2418661
    Sep 25 2017 (07:09AM)


    @all: There are some changes coming to the PNR Forum. 1. All PNRs will be anonymized, i.e. you won't see who posted the PNRs or search PNRs by Traveller. This is to better protect the confidentiality of travelling members and their travel plans. However, members will still be able to search their OWN...
  • Entry# 2409730
    Sep 15 2017 (11:46PM)


    In recent times, the number of FM Complaints regarding "targeting me", "offensive content", "sarcastic comment", "bashing", etc. have been increasing. This has led to increased censorship and throttling of open discussions. . This is a clarification that this site is meant for a FREE EXCHANGE of ideas. Some arguments/debates/disagreements/jokes/sarcasm are ALLOWED and are...
  • Entry# 2390218
    Aug 25 2017 (12:59PM)


    There has been a partial rollout of a modification to Timeline entries. The implementation will be complete within a week. 1. Void & RAC buttons have been removed. . 2. TL Entries can now be Edited and Fixed by the original updater, if there are errors. So there is no need to Void TLs...
  • Entry# 2175399
    Feb 23 2017 (01:22PM)


    There has recently been a lot of frustration among RFs when their Station Pics, Loco Pics, Train Pics get rejected because the "number is not showing", "shed is not visible", the loco/train is at a distance, Train Board is too small, "better pic available", etc. . To address this issue, effective tomorrow, ALL...
Scroll to Top
Scroll to Bottom
Go to Mobile site
Disclaimer: This website has NO affiliation with the Government-run site of Indian Railways. This site does NOT claim 100% accuracy of fast-changing Rail Information. YOU are responsible for independently confirming the validity of information through other sources.